| 2026-10-22 | One-lot subdivision in Upper Frankford Township | Upper Frankford Township | Lot line change | | |
| 2026-10-21 | New Fieldhouse & Site Improvements, South Middleton SD | South Middleton Township | School | | 10,201 |
| 2026-10-20 | 8-lot single-family subdivision in Dickinson Township | Dickinson Township | Single-family homes | 8 | |
| 2026-10-20 | Kuhn Road 4-lot single-family subdivision | Monroe Township | Single-family homes | 4 | |
| 2026-10-19 | North 12th Street Townhouses | Lemoyne Borough | Townhomes | 92 | |
| 2026-10-19 | Dunkin Hartzdale | Lower Allen Township | Restaurant | | 2,201 |
| 2026-10-13 | 1308 & 1310 Pine Road | Dickinson Township | Lot line change | | |
| 2026-10-13 | Lots R-15, R-16, R-17 Southwood Crossing | Southampton Township | Lot line change | | |
| 2026-10-09 | Meadows of Ashcombe Phase I | Monroe Township | Single-family homes | 37 | |
| 2026-10-07 | New poultry operation in Penn Township | Penn Township | Agricultural | | 29,820 |
| 2026-10-06 | Lot addition on a 2.9-acre tract in Hampden Township | Hampden Township | Lot line change | | |
| 2026-09-21 | Two-lot subdivision, Hopewell Township | Hopewell Township | Lot line change | | |
| 2026-09-18 | Ridge Gettle Partners I, LLC warehouse project | Penn Township | Warehouse & storage | | 647,500 |
| 2026-09-17 | Two-lot subdivision, 109 & 111 Sandbank Road | Southampton Township | Lot line change | | |
| 2026-09-11 | Central Penn Super Suites | East Pennsboro Township | Lot line change | | |
| 2026-09-04 | KOS Fuels unattended retail fuel station | Newville Borough | Retail & commercial | | |
| 2026-09-03 | Poultry barn operation, Hopewell Township | Hopewell Township | Agricultural | | 64,000 |
| 2026-09-01 | Two-lot combination with conservation easement | Silver Spring Township | Lot line change | | |
| 2026-09-01 | Lehman's Landing - Phase 3 | North Middleton Township | Townhomes | 57 | |
| 2026-09-01 | The Learning Experience | South Middleton Township | School | | 10,000 |
| 2026-08-28 | Single-family lot subdivision, Hopewell Twp | Hopewell Township | Lot line change | 1 | |
| 2026-08-28 | Pennsylvania Digital 1 (PAX-1) Final Phase 2 | Middlesex Township | Data center | | 675,000 |
| 2026-08-25 | Lot subdivision in Silver Spring Township | Silver Spring Township | Lot line change | | |
| 2026-08-25 | Smith Farm Apartments (Lot 5) - Zenith | South Middleton Township | Apartments | 48 | |
| 2026-08-25 | Heritage Village - Phase 1 | South Middleton Township | Mixed use | 406 | |
| 2026-08-20 | 1-lot subdivision in Silver Spring Township | Silver Spring Township | Lot line change | | |
| 2026-08-16 | Lot subdivision at a mobile home site | Southampton Township | Lot line change | | |
| 2026-08-11 | 214-acre tract subdivision in Monroe Township | Monroe Township | Lot line change | | |
| 2026-08-11 | Lot consolidation in East Pennsboro Township | East Pennsboro Township | Lot line change | | |
| 2026-08-10 | Farm-related business, Southampton Township | Southampton Township | Agricultural | | 7,520 |
| 2026-08-04 | Lot 1, Golden Triangle | Silver Spring Township | Warehouse & storage | | 200 |
| 2026-07-30 | Georgetowne-Phase 1 | South Middleton Township | Other | 58 | |
| 2026-07-29 | Lot addition in Lower Frankford Township | Lower Frankford Township | Lot line change | | |
| 2026-07-27 | Lot reconfiguration in Dickinson Township | Dickinson Township | Lot line change | | |
| 2026-07-20 | Pennsylvania Digital (PAX-1) Phase 1C | Middlesex Township | Data center | | |
| 2026-07-15 | Pleasant Grove SD | Silver Spring Township | Lot line change | | |
| 2026-07-15 | Lot addition in Newville Borough | Newville Borough | Lot line change | | |
| 2026-07-01 | Agricultural parcel subdivision in Upper Allen Township | Upper Allen Township | Lot line change | | |
| 2026-07-01 | Lot consolidation in Upper Allen Township | Upper Allen Township | Lot line change | | |
| 2026-06-30 | Mooreland Elementary School | Carlisle Borough | School | | 21,500 |
| 2026-06-30 | Lot addition subdivision in Hopewell Township | Hopewell Township | Lot line change | | |
| 2026-06-29 | Keystone FC Lisburn Road Phases 2-5 | South Middleton Township | Recreation | | 10,300 |
| 2026-06-26 | Two-parcel farm subdivision, Hopewell Township | Hopewell Township | Lot line change | | |
| 2026-06-22 | Liberty Forge Final Phase 1 | Lower Allen Township | Subdivision (use not stated) | 53 | |
| 2026-06-22 | 401 Fourth Street & 403 Miller Street | East Pennsboro Township | Lot line change | | |
| 2026-06-19 | Sheetz Store #191 Rebuild at Harrisburg Pike (S.R. 0011) | Middlesex Township | Retail & commercial | | 7,616 |
| 2026-06-18 | Cumberland Range Estates - Phase 6 | Middlesex Township | Single-family homes | | |
| 2026-06-16 | McCune Lumber Proposed Lots 1 & 2 | Shippensburg Borough | Lot line change | | |
| 2026-06-15 | 10.6-acre subdivision in South Middleton | South Middleton Township | Lot line change | | |
| 2026-06-11 | Letort Lofts | Carlisle Borough | Apartments | 56 | |
| 2026-06-05 | Two land additions to adjoining parcel | Southampton Township | Lot line change | | |
| 2026-06-05 | Public park lot subdivision, Hopewell Township | Hopewell Township | Recreation | | |
| 2026-06-05 | 2-lot subdivision, West Pennsboro Township | West Pennsboro Township | Single-family homes | 1 | |
| 2026-06-01 | 45 Logistics Drive | South Middleton Township | Industrial | | |
| 2026-06-01 | Poultry operation, Lower Mifflin Township | Lower Mifflin Township | Agricultural | | 64,000 |
| 2026-05-27 | Lot addition on Baltimore Road | Southampton Township | Lot line change | | |
| 2026-05-22 | Autumn Chase PRD Phase VIII | Upper Allen Township | Single-family homes | 42 | |
| 2026-05-20 | Pennsylvania Digital (PAX-1) Phase 1B | Middlesex Township | Data center | | 675,000 |
| 2026-05-14 | Foust Machine and Tool | Hampden Township | Industrial | | 3,600 |
| 2026-05-06 | Lot-line change on Whiskey Springs Road | South Middleton Township | Lot line change | | |
| 2026-05-05 | Waterford Drive Lots 17-20 | Silver Spring Township | Mixed use | | 18,500 |
| 2026-05-01 | Poultry barn operation in Dickinson Township | Dickinson Township | Agricultural | | 70,024 |
| 2026-04-30 | Non-building lot converted to building lot | Lower Mifflin Township | Lot line change | | |
| 2026-04-28 | Maple Lane Farm Market | Monroe Township | Retail & commercial | | 11,986 |
| 2026-04-27 | 312 Steelstown Road | North Newton Township | Lot line change | | |
| 2026-04-23 | Pennsylvania Digital 1 (PAX-1) Phase 1C | Middlesex Township | Data center | | |
| 2026-04-23 | Carlisle Auto Industries Lot 1 of former IAC site | Carlisle Borough | Industrial | | 14,200 |
| 2026-04-23 | Wolf & Tiger LLC. - 1625 Ritner Highway | Carlisle Borough | Government & utilities | | |
| 2026-04-21 | 27 Brookwood Ave renovation and addition | South Middleton Township | Institutional | | 3,500 |
| 2026-04-14 | Sheetz Store #263 Rebuild | Carlisle Borough | Retail & commercial | | 6,872 |
| 2026-04-14 | Two-parcel lot consolidation on Walnut Bottom Road | Dickinson Township | Lot line change | | |
| 2026-04-09 | Morgan's Crossing Townhouses Phase II | South Middleton Township | Townhomes | 39 | |
| 2026-04-09 | Karns Building Addition | South Middleton Township | Other | | |
| 2026-04-06 | PPE Property Management, LLC | Shippensburg Township | Other | | |
| 2026-04-02 | O'Reilly Auto Parts, Carlisle, PA (CL1) | North Middleton Township | Retail & commercial | | 7,460 |
| 2026-03-30 | WellSpan Carlisle | Dickinson Township | Office | | |
| 2026-03-30 | Arcona Neighborhood 7 | Lower Allen Township | Lot line change | | 60,000 |
| 2026-03-25 | 237 Green Hill Road lot line change | West Pennsboro Township | Lot line change | | |
| 2026-03-23 | Lot line change off Hair Road, Penn Township | Penn Township | Lot line change | | |
| 2026-03-12 | Bulldog Investors four-unit multi-family dwelling | Newville Borough | Apartments | 4 | |
| 2026-03-10 | 207 & 209 Senate Avenue apartments | East Pennsboro Township | Apartments | 210 | |
| 2026-03-05 | Pennsylvania Digital (PAX-1) Final Subdivision | Middlesex Township | Data center | | |
| 2026-03-02 | Two-tract subdivision in Silver Spring Township | Silver Spring Township | Lot line change | | |
| 2026-02-25 | Lot addition subdivision, East Pennsboro Twp | East Pennsboro Township | Lot line change | | |
| 2026-02-20 | 3 & 5 Teejay Drive | South Middleton Township | Lot line change | | |
| 2026-02-19 | Pennsylvania Digital (PAX-1) Phase 1A | Middlesex Township | Data center | | |
| 2026-02-17 | North American Coffee Partnership | Lower Allen Township | Lot line change | | |
| 2026-02-09 | Meadows of Ashcombe | Monroe Township | Single-family homes | 98 | |
| 2026-02-06 | Bay Family Farm, LLC lot consolidation | Monroe Township | Lot line change | | |
| 2026-02-06 | Deerfield Phases 3A & 3D | Southampton Township | Single-family homes | 37 | |
| 2026-02-04 | South Middleton Municipal Authority Well No. 1 Water Tank | South Middleton Township | Government & utilities | | 841 |
| 2026-01-30 | 1819 South Market Street - Gettysburg Pike Child Care Center | Upper Allen Township | School | | |
| 2026-01-27 | 40 Koser Road lot-line change | North Newton Township | Lot line change | | |
| 2026-01-23 | Bookstore and parking lot, North Newton Township | North Newton Township | Retail & commercial | | 4,000 |
| 2026-01-15 | Lot line adjustment in Dickinson Township | Dickinson Township | Lot line change | | |
| 2026-01-09 | 7 Beaver Avenue | East Pennsboro Township | Lot line change | | |
| 2026-01-09 | Mountain View Estates Phase 6 | North Middleton Township | Single-family homes | 35 | |
| 2026-01-05 | Ahold Delhaize Solar Development | Middlesex Township | Government & utilities | | |
| 2025-12-31 | 120 x 200 ft building, Southampton Township | Southampton Township | Other | | 24,000 |
| 2025-12-31 | Poultry building, Southampton Township | Southampton Township | Agricultural | | 26,000 |
| 2025-12-31 | 605 Brentwater Road | East Pennsboro Township | Single-family homes | 1 | |
| 2025-12-30 | 1924 Fisher Road | Upper Allen Township | Townhomes | 19 | |
| 2025-12-30 | Jim Thorpe Center & Sam Rose '58 Art Gallery | Carlisle Borough | Institutional | | 9,541 |
| 2025-12-30 | 101 Crossroad School Road | West Pennsboro Township | Lot line change | | |
| 2025-12-23 | Arcona Lots 3-6 | Lower Allen Township | Mixed use | 140 | 116,225 |
| 2025-12-23 | PRVCA Training Center | Upper Allen Township | Institutional | | 18,305 |
| 2025-12-17 | Pole building for vehicle and equipment storage | Mount Holly Springs Borough | Warehouse & storage | | 1,944 |
| 2025-12-16 | Pennsylvania Digital 1 (PAX-1) Phase 2 | Middlesex Township | Data center | | 675,000 |
| 2025-12-16 | Pennsylvania Digital 1 (PAX-1) Phase 3 | Middlesex Township | Data center | | 675,000 |
| 2025-12-16 | 120 Peach Glen Road | Dickinson Township | Subdivision (use not stated) | | |
| 2025-12-15 | 1497 Kuhn Road | Monroe Township | Lot line change | | |
| 2025-12-15 | 755 Eppley Road | Monroe Township | Agricultural | | |
| 2025-12-09 | Reykjavik Creamery | Lower Mifflin Township | Industrial | | 99,750 |
| 2025-12-08 | CASD Middle School | North Middleton Township | School | | 157,000 |
| 2025-12-05 | Pennsylvania Digital 1 (PAX-1) Phase 1B | Middlesex Township | Data center | | 675,000 |
| 2025-12-01 | Lot addition in Penn Township | Penn Township | Lot line change | | |
| 2025-11-24 | 200 Booz Road | Hopewell Township | Lot line change | | |
| 2025-11-24 | Phase IV Final Subdivision Plan for the Plan of Bennington | North Middleton Township | Single-family homes | 30 | |
| 2025-11-24 | Messiah College (Lime Kiln) | Upper Allen Township | Lot line change | | |
| 2025-11-20 | SILVER SPRING WATER TREATMENT PLANT PFAS TREATMENT ADDITION | Silver Spring Township | Government & utilities | | 8,024 |
| 2025-11-19 | Two-lot subdivision on farmland | Upper Mifflin Township | Lot line change | | |
| 2025-11-17 | Poultry operation in Upper Frankford Township | Upper Frankford Township | Agricultural | | 36,524 |
| 2025-11-11 | Lot consolidation in East Pennsboro Township | East Pennsboro Township | Lot line change | | |
| 2025-11-10 | Lot addition subdivision in Newville Borough | Newville Borough | Lot line change | | |
| 2025-11-10 | Parcel subdivision south of PA Turnpike | Silver Spring Township | Lot line change | | |
| 2025-11-04 | Lot consolidation and new lot, Silver Spring Twp | Silver Spring Township | Lot line change | | |
| 2025-11-04 | Nursery barn, greenhouse and materials pad | Silver Spring Township | Agricultural | | 5,400 |
| 2025-10-31 | Saint Patrick Building Addition | South Middleton Township | Institutional | | 6,000 |
| 2025-10-30 | Christian Aid Ministries | North Newton Township | Institutional | | 10,000 |
| 2025-10-27 | West Shore Country Club Proposed Maintenance Building | East Pennsboro Township | Recreation | | 2,400 |
| 2025-10-27 | Tract subdivision in North Newton Township | North Newton Township | Lot line change | | |
| 2025-10-24 | The Point @ Carlisle Plaza | Carlisle Borough | Lot line change | | |
| 2025-10-21 | 960 Century Drive | Lower Allen Township | Lot line change | | |
| 2025-10-21 | 5117 E. Trindle Road | Hampden Township | Retail & commercial | | 20,000 |
| 2025-10-20 | 125 E High Street | Carlisle Borough | Lot line change | | |
| 2025-10-10 | E & B Property Management, LLC | Southampton Township | Lot line change | | |
| 2025-10-09 | 2-lot subdivision in Shippensburg Borough | Shippensburg Borough | Lot line change | | |
| 2025-10-08 | Lot addition in Dickinson Township | Dickinson Township | Lot line change | | |
| 2025-10-07 | Parcel reconfiguration in Silver Spring Township | Silver Spring Township | Lot line change | | |
| 2025-10-06 | Poultry barn and egg room in Penn Township | Penn Township | Agricultural | | 63,700 |
| 2025-10-01 | McCormick Road Subdivision | Upper Allen Township | Single-family homes | | |
| 2025-09-30 | Lot addition in North Middleton Township | North Middleton Township | Lot line change | | |
| 2025-09-29 | Lot line change in West Pennsboro Township | West Pennsboro Township | Lot line change | | |
| 2025-09-29 | Lot addition to neighboring land in Lower Mifflin | Lower Mifflin Township | Lot line change | | |
| 2025-09-29 | Single-family home on lot split in Upper Mifflin | Upper Mifflin Township | Single-family homes | 1 | |
| 2025-09-24 | 36 E. Main Street residential subdivision | West Pennsboro Township | Single-family homes | 3 | |
| 2025-09-24 | 45 McCullough Road lot subdivision | South Newton Township | Single-family homes | 1 | |
| 2025-09-22 | 3 MW solar energy system on Middlesex Road | Middlesex Township | Other | | |
| 2025-09-15 | Two-lot subdivision on Creekview Road | Hampden Township | Lot line change | | |
| 2025-09-12 | Pine View Development | North Middleton Township | Single-family homes | 29 | |
| 2025-09-09 | 1047 York Road | Monroe Township | Lot line change | | |
| 2025-09-03 | Peach Glen Agricultural Project | Dickinson Township | Agricultural | | 41,690 |
| 2025-09-03 | Pine Creek Structures Harrisburg Sales Lot | Upper Allen Township | Retail & commercial | | 720 |
| 2025-09-03 | 30 Hunter Lane | East Pennsboro Township | Lot line change | | |
| 2025-09-02 | 1 Baden Powell Lane | Silver Spring Township | Office | | 4,780 |
| 2025-08-29 | Dark Star Solar | West Pennsboro Township | Other | | |
| 2025-08-29 | Minor subdivision on West Pennsboro Township parcel | West Pennsboro Township | Lot line change | | |
| 2025-08-28 | R&I Building Addition and Plant 5 Expansion | Carlisle Borough | Industrial | | 119,649 |
| 2025-08-26 | REDCO Business Plaza parcel consolidation | Middlesex Township | Lot line change | | |
| 2025-08-26 | Dogwood Acres Campground lot addition | Upper Frankford Township | Lot line change | | |
| 2025-08-25 | Gandy Manor Phase 2 | Shippensburg Borough | Apartments | 6 | |
| 2025-08-25 | Dickinson College lot consolidation | Carlisle Borough | Lot line change | | 8,252 |
| 2025-08-21 | Cumberland Technology Park Lots 4A and 4B | Hampden Township | Retail & commercial | | 6,050 |
| 2025-08-20 | 2-lot subdivision and duplex on Helen Street | East Pennsboro Township | Townhomes | 2 | |
| 2025-08-19 | New Visions Shippensburg group home | Shippensburg Township | Institutional | | 11,000 |
| 2025-08-19 | Project Bolt data center campus | Middlesex Township | Data center | | |
| 2025-08-19 | Project Bolt Phase 1A infrastructure | Middlesex Township | Data center | | |
| 2025-08-14 | 11 Kelly Road | Penn Township | Lot line change | | |
| 2025-08-13 | Schreiber Foods yogurt and milk receiving expansion | Shippensburg Borough | Industrial | | 22,694 |
| 2025-08-07 | Two-tract consolidation, East Pennsboro Township | East Pennsboro Township | Lot line change | | |
| 2025-08-07 | Cumberland Knoll - PPL Laydown | Middlesex Township | Single-family homes | | |
| 2025-08-01 | Lot #1 lot addition, Newburg Borough | Newburg Borough | Lot line change | | |
| 2025-08-01 | Chipotle at The Mills at Shepherdstown Crossing | Upper Allen Township | Restaurant | | 2,385 |
| 2025-08-01 | Two-barn poultry operation, West Pennsboro | West Pennsboro Township | Agricultural | | 48,400 |
| 2025-07-31 | Threefold Schoolhouse | Upper Allen Township | School | | 6,200 |
| 2025-07-30 | 4220 & 4277 Enola Road | Upper Frankford Township | Lot line change | | |
| 2025-07-28 | Lot line change, West Pennsboro Township | West Pennsboro Township | Lot line change | | |
| 2025-07-24 | Lot additions on 3.9-acre tract, Dickinson Twp | Dickinson Township | Lot line change | | |
| 2025-07-23 | Wolf & Tiger LLC | Carlisle Borough | Government & utilities | | |
| 2025-07-22 | Poultry operation, West Pennsboro Township | West Pennsboro Township | Agricultural | | 48,400 |
| 2025-07-21 | Keystone Fieldhouse/Aquatics Center | South Middleton Township | Lot line change | | |
| 2025-07-15 | Wesley United Methodist Church subdivision | Mechanicsburg Borough | Lot line change | | |
| 2025-07-11 | Residential lot subdivision in Dickinson Township | Dickinson Township | Lot line change | | |
| 2025-07-10 | Residential lot subdivision from farmland | Middlesex Township | Lot line change | | |
| 2025-07-02 | Allen Middle School | Lower Allen Township | School | | 62,000 |
| 2025-06-25 | Keystone FC - Lisburn Road Phase 1 | South Middleton Township | Recreation | | |
| 2025-06-25 | Boiling Springs Mill restaurant | South Middleton Township | Restaurant | | 4,000 |
| 2025-06-24 | Locust Point Solar Project | Monroe Township | Subdivision (use not stated) | | |
| 2025-06-23 | 1186 Harrisburg Pike redevelopment | Middlesex Township | Retail & commercial | | |
| 2025-06-23 | Outback Storage self-storage building | Upper Frankford Township | Warehouse & storage | | 9,750 |
| 2025-06-23 | Residential lot subdivision, Upper Frankford Twp | Upper Frankford Township | Lot line change | | |
| 2025-06-19 | Ghimirey LLC: lot recombination | Monroe Township | Lot line change | | |
| 2025-06-19 | Wal-Mart Supercenter #05358-238 Building Expansion | Shippensburg Township | Retail & commercial | | 3,116 |
| 2025-06-19 | Lot line adjustment, 109 and 111 Steven Drive | Silver Spring Township | Lot line change | | |
| 2025-06-18 | Carlisle Sports Emporium | Middlesex Township | Lot line change | | |
| 2025-06-13 | West Pennsboro lot subdivision with land additions | West Pennsboro Township | Lot line change | | |
| 2025-06-05 | 433 Zion Road | South Middleton Township | Office | | |
| 2025-06-03 | Two-lot subdivision along West Creek Road | Hopewell Township | Lot line change | | |
| 2025-05-30 | Poultry operation, Upper Frankford Township | Upper Frankford Township | Agricultural | | 58,464 |
| 2025-05-29 | The Village at North Ridge – Phase 5 | North Middleton Township | Townhomes | 44 | |