About this project
A building addition to the existing Reykjavik Creamery facility in Lower Mifflin Township, with new parking, stormwater facilities, utility extensions and landscaping. The addition totals about 99,750 sq ft.
Official description: The purpose of the this plan is to add a building addition to the existing building. As a part of the building, additional site features will be built including parking lots, stormwater facilities, utility extensions and landscaping.
The full picture AI research · Nov 1, 2026
County records describe a building addition to the existing Reykjavik Creamery plant in Lower Mifflin Township. The addition would be about 99,750 square feet. That is roughly the size of two large supermarkets. The plans also include new parking, stormwater facilities, utility extensions and landscaping.
The creamery already operates on the site as a food-processing (industrial) facility. The addition would expand that existing operation rather than create a new one on undeveloped land.
No news coverage, township meeting records or developer project page about this specific addition was found online. The details here come only from the county filing, the latest of which is dated December 2025.
What it could mean nearby
- New parking and utility extensions suggest more vehicle activity and more demand on water and sewer service. The records give no traffic or capacity figures.
- Stormwater facilities are part of the plan. They are meant to manage runoff from the new roof and paved areas.
- Landscaping is included, which may soften views of the building. The records give no details on screening.
Where it stands
The county records show a filing dated 2025-12-09, so the plan appears to be under local review. No approval or denial was found online. Typically the township reviews the land development plan and the county and state check stormwater and utility details. Approval is then followed by permits and construction.
- Dec 9, 2025 Latest county planning filing for the addition
Want to weigh in? Land development plans in a township like this are usually reviewed by the township supervisors and planning commission at public meetings, so residents can check the Lower Mifflin Township meeting agendas or contact the township office.
Who's behind it
Reykjavik Creamery
Planning terms explained
- Land development
- A formal township review for building additions, parking and other site work, covering things like layout, stormwater and utilities.
- Stormwater facilities
- Basins, pipes or similar features that collect and slowly release rain runoff from roofs and paved areas.
- Utility extension
- Lengthening water, sewer or other service lines so they reach the new building.
- Industrial
- A land-use category for manufacturing, processing and similar operations.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $13.0M
- ~997 roofing squares (assumes 1 story)
- ~249 tons of cooling (rule of thumb 400 sq ft/ton)