Cumberland County · South Middleton Township · #3205
Keystone FC Lisburn Road Phases 2-5
South Middleton Township, PA · 10,300 sq ft non-residential, recreation
About this project
Phases 2-5 of the Keystone FC soccer complex on Lisburn Road in South Middleton Township, adding nine soccer fields with driveways, parking, landscaping and stormwater features to complete a 10-field facility.
Official description: The purpose of this project is to construct 9 soccer fields with associated site features such as driveways, vehicle parking, landscaping and stormwater features. This plan will include phases 2-5 of the preliminary plan previously approved February 13, 2025. This plan will complete the 10 soccer field sports facility.
The full picture AI research · Nov 1, 2026
Keystone FC, a regional soccer club, plans to finish a soccer complex on Lisburn Road in South Middleton Township. County records say Phases 2-5 would add nine soccer fields. They would also add driveways, parking, landscaping and stormwater features. Together with the first phase, that makes a 10-field facility. The records list about 10,300 square feet of non-residential floor area, which probably means small support buildings rather than a large structure.
Public reports describe Phase I as road improvements along Lisburn Road plus an artificial turf field with parking. A small state Local Share Account grant of about $47,900 was reported for that work. An earlier club proposal for a different site on York Road was reported as dropped.
No news coverage or meeting records about Phases 2-5 were found, so approval details beyond the county filing are unknown.
What it could mean nearby
- Games and tournaments could bring more traffic and parking demand to Lisburn Road; Phase I included road improvements there.
- Nine added fields mean more paved area, so stormwater features are part of the plan to manage runoff.
- The complex would add organized sports space for local youth and club players.
Where it stands
County records show a filing dated 2026-06-29 for Phases 2-5. No approval or construction news was found. Plans like this usually go through township and county review and then need stormwater and other permits before construction.
- Jun 29, 2026 Latest county planning filing for Phases 2-5
Want to weigh in? The South Middleton Township supervisors and planning commission generally review land development plans at public meetings, so residents can comment there or contact the township office.
Who's behind it
Keystone FC · A Pennsylvania youth and regional soccer club, founded in 1980 as Mechanicsburg Soccer Club and renamed Keystone FC in 2016.
Around the web
- CAEDC secures nearly $48,000 for Mechanicsburg soccer complex projectCumberland BusinessReports a grant for Phase I of the Keystone FC complex on Lisburn Road, covering road work and a turf field with parking.
Planning terms explained
- Land development plan
- A detailed site plan the township reviews for new buildings, parking, roads and drainage.
- Stormwater management
- Features such as basins that hold and slow rain runoff so it does not flood neighbors.
- Phase
- One stage of a project built in sequence rather than all at once.
- Non-residential square footage
- Building floor area that is not housing, such as restrooms, storage or concession space.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.1M
- ~103 roofing squares (assumes 1 story)
- ~25 tons of cooling (rule of thumb 400 sq ft/ton)