Cumberland County · Upper Allen Township · #3140
PRVCA Training Center
Upper Allen Township, PA · 18,305 sq ft non-residential, institutional
About this project
An 18,305 sq ft training center with site improvements on a consolidated lot of about 4.33 acres in Upper Allen Township.
Official description: The purpose of this plan is to design an 18,305 SF Training Center along with the associated site improvements situated on a proposed consolidated lot totaling approximately 4.33 acres.
The full picture AI research · Nov 1, 2026
County records describe a proposed training center of about 18,305 square feet. It would sit on a consolidated lot of roughly 4.33 acres in Upper Allen Township, Cumberland County, along with parking, drainage and other site improvements. The building is classed as institutional, meaning a non-commercial, non-residential use such as training or education.
The records don't say what the lot looks like today, who will run the center, or what kind of training it will host. No news coverage, meeting agendas, minutes, hearing notices or developer page was found that clearly matches this project. The meaning of "PRVCA" could not be confirmed, so nothing is assumed about the occupant. Nothing was found about opposition or approvals.
What it could mean nearby
- Traffic and access effects can't be assessed. No traffic study or site-access details were found.
- Job or enrollment numbers are unknown, so the effect on local employment is unclear.
- Stormwater and utility needs are normal for a building of this size but weren't described in any source found.
Where it stands
The latest county filing is dated 2025-12-23, which suggests a land development plan is under municipal and county review. Typical next steps are review by the township planning commission, a decision by the supervisors, then permits and construction. No decision was found online.
- Dec 23, 2025 Latest filing in county planning records
Want to weigh in? The Upper Allen Township Planning Commission and Board of Supervisors usually review land development plans at public meetings, and residents can comment there. Agendas are posted on the township's website.
Planning terms explained
- Land development
- The formal municipal review of a plan to build on a site, covering the building, parking, drainage and access.
- Consolidated lot
- Several parcels legally merged into one lot.
- Institutional
- A category for uses like schools, training facilities, churches or public-service buildings, as distinct from homes or stores.
- Site improvements
- Work outside the building itself, such as paving, utilities, stormwater controls and landscaping.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $6.4M
- ~91 roofing squares (assumes 2 stories)
- ~45 tons of cooling (rule of thumb 400 sq ft/ton)