Cumberland County · Southampton Township · #2891
Southwood Crossing - Phase: Rine Drive
Southampton Township, PA · 17 homes, single-family homes
About this project
Finalizes lots along Rine Drive in the Southwood Crossing development, made up of Phase 9 Section 2 and Phase 8 Section 3, for 17 units in Southampton Township.
Official description: Finalize lots along Rine Drive. Phase Rine Drive is made up of Phase 9 Section 2 and Phase 8 Section 3.
Filing history
- 2024-08-02 · #2891 · Submission · 17 lots/units
The full picture AI research · Nov 1, 2026
The county record covers the final approval of lots along Rine Drive in the Southwood Crossing neighborhood in Southampton Township. The lots come from two parts of the neighborhood, Phase 9 Section 2 and Phase 8 Section 3. Together they make 17 single-family homesites.
Southwood Crossing is an existing neighborhood with a Shippensburg mailing address. Online real estate listings show homes already built or under construction on Rine Drive and nearby streets. The listings name a local builder, but they are sales pages and not official project records. No news coverage, opposition or township meeting records were found for this filing.
What it could mean nearby
- The 17 new homes add to an already developing neighborhood and would add some traffic on Rine Drive and the streets that connect to it.
- The homes would likely send children to the Shippensburg Area School District, which serves this township.
- The records do not say anything about open space, road changes or utility upgrades.
Where it stands
The county's latest filing, dated 2024-08-02, finalizes the lots, which suggests the subdivision plan has reached its last approval step. Next, the lots are usually recorded, and building permits are issued as homes are built and sold.
- Aug 2, 2024 Latest county filing finalizing 17 lots along Rine Drive
Want to weigh in? Final subdivision plans are typically reviewed by the Southampton Township supervisors and the Cumberland County planning staff, and residents can raise concerns at the township's public meetings. This plan appears to have already been finalized.
Planning terms explained
- Final plan
- The last version of a subdivision plan, which the township approves before lots can be officially created and recorded.
- Phase
- One stage of a large development that is built in steps over several years.
- Section
- A smaller piece of a phase, usually covering a set of lots and the street serving them.
- Subdivision
- The division of land into separate lots that can be sold or built on.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $9.5M
- ~544 roofing squares
- ~17 HVAC systems
- ~17 kitchens / 34+ bathrooms
- ~47,600 sq ft of finished living space