York County · Paradise Township · #25-0226
Tall Grass Meadows, Ph II-A
Paradise Township, PA · 58 homes, single-family homes · 50.2 acres
About this project
A final plan for Phase II-A of Tall Grass Meadows, with 58 single-family homes on about 50 acres in Paradise Township.
County recommendation: Consistent with county plan
- Engineer / designer
- Integrated Consulting
- Plan type
- Final
- Land use
- Single-family
- Water
- Public water
- Sewer
- Public sewer
The full picture AI research · Nov 1, 2026
Tall Grass Meadows Phase II-A is a proposed neighborhood of 58 single-family homes on about 50 acres in Paradise Township, York County. The county filing is a final plan. That is the detailed version of a subdivision layout, showing lot lines, streets and utilities.
At roughly one home per acre, the plan leaves room for yards and open ground. The "II-A" label suggests it is one part of a larger, multi-phase community. The county records do not say what is on the land now. Integrated Consulting is the only firm listed on the filing.
No news coverage, meeting minutes, builder page or opposition was found that clearly concerns this project. This explanation rests on the county records alone.
What it could mean nearby
- 58 new households would add traffic to nearby roads. The records do not give a traffic study or the access points.
- New homes could add students to the local school district. No enrollment figures were found.
- The homes would need water, sewer or septic service. The records do not say which.
Where it stands
The latest county filing, from late November 2025, is a final plan. Final plans are usually the last major review before approval and recording. After that, the developer normally needs permits and then starts construction. No approval decision was found online.
- Nov 24, 2025 Latest county filing for the Phase II-A final plan
Want to weigh in? Final subdivision plans are usually decided by the township supervisors after the planning commission reviews them. Residents can comment at those public meetings, and the Paradise Township office can confirm the schedule.
Planning terms explained
- Final plan
- The detailed subdivision drawing that a municipality approves before lots can be recorded and built on.
- Phase
- One stage of a larger development that is built and approved in steps.
- Subdivision
- The division of a larger parcel of land into smaller lots, usually with new streets.
- Board of Supervisors
- The elected township body that votes on development plans.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $32.5M
- ~1,856 roofing squares
- ~58 HVAC systems
- ~58 kitchens / 116+ bathrooms
- ~162,400 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →