York County · Springfield Township · #25-0090
Fox Spring at Lake Road
Springfield Township, PA · 75 homes, single-family homes · 63.4 acres
About this project
A preliminary-final subdivision in Springfield Township for 75 single-family homes on a 63.4-acre site.
County recommendation: Consistent with county plan
- Engineer / designer
- Warehaus
- Plan type
- Preliminary Final Subdivision
- Land use
- Single-family
- Water
- Public water
- Sewer
- On-lot septic
Filing history
- 2025-05-09 · #25-0090 · Preliminary Final Subdivision · 75 lots/units
The full picture AI research · Nov 1, 2026
Fox Spring at Lake Road is a proposed neighborhood of 75 single-family homes on a 63.4-acre site in Springfield Township, York County. The county planning record lists Warehaus as the firm on the filing. That works out to roughly one home for every acre, so a good deal of the land could stay open or serve as yards, roads and stormwater areas.
The latest county filing, dated May 9, 2025, is a preliminary-final subdivision plan. This type of plan asks for approval to divide the land into building lots and lay out the streets and utilities in a single step.
No news coverage, township meeting records, developer project page or permits specific to this project were found online. Details such as home prices, builder, schedule, opposition or approvals could not be confirmed.
What it could mean nearby
- Roughly 75 new households would add traffic on Lake Road and nearby roads. The size of that increase has not been confirmed.
- New homes could add students to the local school district and demand for water, sewer or septic, and stormwater systems. No project-specific figures were found.
Where it stands
The latest county filing, from May 2025, shows a preliminary-final subdivision plan. No approval or denial was found online. Next steps usually include township and county planning review, then a vote by the township supervisors, then permits before construction.
- May 9, 2025 Latest filing in the county planning records
Want to weigh in? The Springfield Township supervisors normally vote on subdivision plans, and residents can usually comment at their public meetings or in writing to the township office.
Who's behind it
Warehaus
Planning terms explained
- Preliminary-final subdivision plan
- A combined plan that asks for both preliminary and final approval to split land into lots, with streets and utilities shown.
- Subdivision
- The process of dividing a larger piece of land into smaller lots for building.
- Stormwater management
- Basins, pipes and other features that control rainwater runoff from roofs, roads and lawns.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $42.0M
- ~2,400 roofing squares
- ~75 HVAC systems
- ~75 kitchens / 150+ bathrooms
- ~210,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →