York County · Paradise Township · #24-0223
JJD Group LLC
Paradise Township, PA · 12 homes, other · 4.7 acres
About this project
A 12-unit mobile home park on about 4.7 acres in Paradise Township, submitted as a final land development.
County recommendation: Consistent with county plan
- Engineer / designer
- Site Design Concepts
- Plan type
- Final Land development
- Land use
- Mobile home park
- Water
- Public water
- Sewer
- Public sewer
Filing history
- 2024-12-05 · #24-0223 · Final Land development · 12 lots/units
The full picture AI research · Nov 1, 2026
A company called JJD Group LLC has filed a plan with York County for a 12-unit mobile home park in Paradise Township. The site covers about 4.7 acres, so the park would have roughly two to three homes per acre.
The filing is a "final land development" plan. That is the last detailed review step before a township can approve a project. Site Design Concepts, a firm listed on the filing, most likely prepared the plans. The county summary does not describe what is on the land now, and it does not say who would live there or whether the homes would be owned or rented.
No news coverage, meeting minutes, developer website or permit records were found for this specific project. The searches returned only unrelated items, including a similarly named township in a different county.
What it could mean nearby
- Twelve new housing units would add a small amount of traffic on the roads serving the site. The records do not give a traffic estimate.
- A park this size would probably need its own water and sewer arrangements or a connection to existing service. The records do not say which.
Where it stands
The latest county filing is dated December 5, 2024, and it is a final land development submission. The township usually reviews a plan like this, and the supervisors then vote to approve it, approve it with conditions, or deny it. No decision was found online.
- Dec 5, 2024 Latest county filing for the final land development plan
Want to weigh in? The Paradise Township supervisors normally decide on land development plans, and residents can usually comment at their public meetings. Check the township's posted agendas for dates.
Who's behind it
JJD Group LLC
Planning terms explained
- Final land development
- The last detailed plan a township reviews before approving construction on a site.
- Mobile home park
- A property where residents place manufactured homes on lots within a community that has shared roads and utilities.
- Board of Supervisors
- The elected township body that votes on whether to approve development plans.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $6.7M
- ~384 roofing squares
- ~12 HVAC systems
- ~12 kitchens / 24+ bathrooms
- ~33,600 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →