KNSM Holdings commercial land development

York Township, PA · 11,907 sq ft non-residential, retail & commercial · 7.2 acres

About this project

A preliminary-final land development in York Township proposes a commercial project of about 11,907 square feet on 7.2 acres.

County recommendation: Consistent with county plan

Engineer / designer
Site Design Concepts, Inc.
Plan type
Preliminary Final Land development
Land use
Commercial
Water
Public water
Sewer
Public sewer

Filing history

  • 2024-05-29 · #24-0106 · Preliminary Final Land development · 11,907 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

A land development plan filed with York County proposes a commercial project of about 11,907 square feet of buildings on roughly 7.2 acres in York Township. The county classifies it as retail and commercial use. That is a small amount of building for a fairly large lot, so much of the site would likely be parking, driveways, stormwater features and open ground.

The plan is a "preliminary-final" land development, which means the developer asked for preliminary and final approval of the layout in one step. The filing lists a civil engineering firm, Site Design Concepts, Inc. The county records do not say who the tenants would be or what the site is used for today.

No news coverage, township meeting agendas or minutes, or developer web page about this project were found. This explanation therefore rests on the county records alone.

What it could mean nearby

Where it stands

The county's latest filing is dated 2024-05-29. Township review usually comes next: the planning commission reviews the plan, then the township supervisors vote on approval. No approval or denial was found online, so the current status is unconfirmed.

Want to weigh in? The York Township planning commission and board of supervisors normally review land development plans at public meetings. Residents can comment there or contact the township office for agendas.

Who's behind it

KNSM Holdings

Planning terms explained
Land development
A formal township review of a plan to build or enlarge buildings, parking and related site work on a lot.
Preliminary-final plan
A plan submitted for preliminary and final approval in a single step, rather than in two separate rounds.
Stormwater management
Design features that collect and slow rain runoff from paved and built areas so it does not flood neighbors or pollute streams.
Planning commission
A local advisory board that reviews development plans and recommends action to the elected governing body.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.4M