York County · Peach Bottom Township · #24-0053
Farm accessory building in Peach Bottom Township
Peach Bottom Township, PA · 36,440 sq ft non-residential, agricultural · 143.9 acres
About this project
A preliminary final land development plan for a 36,440 sq ft accessory agricultural building on about 144 acres in Peach Bottom Township.
Official description: Accessory Ag Building
County recommendation: Consistent with county plan
- Engineer / designer
- NCS
- Plan type
- Preliminary Final Land development
- Land use
- Agricultural
- Water
- On-lot well
- Sewer
- On-lot septic
Filing history
- 2024-03-27 · #24-0053 · Preliminary Final Land development · 36,440 sq ft
The full picture AI research · Nov 1, 2026
A preliminary final land development plan was filed with York County for a farm accessory building in Peach Bottom Township. The building would be about 36,440 square feet, roughly the size of a large warehouse or several big barns. It would sit on a farm of about 144 acres.
The county record calls it agricultural. It does not say what the building will be used for, such as storage, livestock or equipment. Land that size is most likely open farmland now, but the records do not describe what is there.
No news coverage, township meeting minutes, developer website or permit records specific to this project were found online. This explanation relies on the county facts alone.
What it could mean nearby
- Because the building is on about 144 acres, it would likely stay well back from most neighbors, though the records do not show its exact location.
- Truck or equipment traffic would depend on the building's use, which the records do not state.
- The records do not show any new homes, jobs, school effects or utility changes.
Where it stands
The latest county filing is dated 2024-03-27 and is a preliminary final land development plan. The township supervisors usually review such a plan next, after the township and county planning commissions comment. Whether it has since been approved was not found.
- Mar 27, 2024 Latest county filing for the land development plan
Want to weigh in? The Peach Bottom Township Board of Supervisors normally decides land development plans. Residents can comment at its public monthly meetings, which the township website says are held on the first Wednesday of each month.
Planning terms explained
- Land development plan
- A set of drawings and documents showing a proposed building or site layout, which the township reviews before construction.
- Preliminary final plan
- A plan submitted for review that is close to final approval but may still need changes or conditions.
- Accessory building
- A building that supports the main use of a property, such as a farm.
- Agricultural use
- Land or buildings used for farming, such as crops, livestock or storing farm equipment.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $7.3M
- ~364 roofing squares (assumes 1 story)
- ~91 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →