PlannedNearby

Philadelphia · Carroll Park · #ZP-2026-004947

45-unit residential building, 5100 Lancaster Ave

5100 Lancaster Ave, Carroll Park, PA · 45 homes, mixed use

About this project

An attached structure is planned at 5100 Lancaster Ave with 45 multi-family dwelling units above vacant commercial space on the first floor. The plan includes a residential roof deck, one off-street loading space and 15 bicycle parking spaces.

Official description: PERMIT On the same lot as an existing detached structure: For the erection of an attached structure, to include a residential roof deck with pilot houses, off-street loading, and class 1a bicycle parking. Size and location per plan. For the proposed uses of Vacant Commercial on the first floor (use registration required prior to occupancy), and Multi-Family Household Living (45 dwelling units) with one off-street loading space and 15 Class 1a bicycle parking spaces.

Plan type
Zoning Board appeal (Variance)
Status
Zoning Board: Scheduled, hearing 2026-10-21

Filing history

  • 2026-06-17 · #ZP-2026-004947 · Zoning Board appeal (Variance)

City property record, permits and appeals (Atlas) →

The full picture AI research · Nov 1, 2026

The developer plans a new building at 5100 Lancaster Ave. in West Philadelphia's Carroll Park area. It would hold 45 apartments above a ground-floor commercial space that is currently planned to stay vacant. The building would also have a roof deck for residents, one off-street loading space and 15 bicycle parking spaces.

It is one of three nearby projects by the same developer, Haverford Square Properties. Together they would add about 420 apartments and more than 30,000 square feet of commercial space along an industrial stretch of Lancaster Avenue. A 2026 Inquirer report says this building would also house the developer's headquarters, and that most of its apartments would have two bedrooms.

The project needs zoning relief because it exceeds the allowed unit count and height. At a community meeting reported by the Inquirer, more attendees opposed it than supported it. Concerns included parking, height and displacement. A nearby nonprofit community center also criticized the plans. The developer says it would build a smaller version without commercial space if approval fails.

What it could mean nearby

Where it stands

The project needs approval from the Zoning Board of Adjustment, and the latest county filing is dated 2026-06-17. No hearing date or decision was found. If the board approves it, the developer would normally go on to permit review before construction can begin.

Want to weigh in? The city's Zoning Board of Adjustment decides on the zoning relief, and residents can comment through the local community meeting process and at the board's public hearing.

Who's behind it

Haverford Square Properties · A Philadelphia developer founded in 2008 in Mantua that focuses on West Philadelphia neighborhoods such as Belmont and Parkside, and is also planning nearby projects at 5140 and 5022–32 Lancaster Ave.

Around the web

Planning terms explained
Zoning Board of Adjustment
The city body that decides whether a project can exceed the limits set by the zoning rules, such as height or number of units.
Variance
Special permission to build something that the zoning rules would not normally allow.
Mixed use
A building that combines homes with shops or other businesses.
Off-street loading space
A spot on the property where delivery trucks can stop without blocking the street.
Mixed Income Housing Bonus
A city program that lets developers build larger projects if some of the units are made affordable.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $25.2M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →