PlannedNearby

Ocean County · Toms River Township · #TRT2683F

Retail Store on NJ Route 37

NJ Route 37, Toms River Township, NJ · 48,190 sq ft non-residential, retail & commercial · 17.6 acres

About this project

Site plan for a retail store of about 48,200 square feet on a 17.6-acre site on NJ Route 37 in Toms River Township.

Official description: Retail Store

Engineer / designer
Bohler Engineering
Plan type
Site plan
Land use
Commercial
Status
Approved with Contingency

Filing history

  • 2026-05-06 · #TRT2683F · Site plan · 48,190 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

The filing describes a store of about 48,200 square feet on a 17.6-acre site along NJ Route 37 in Toms River. Local news coverage indicates this is an expansion of the existing Walmart at 924 Route 37 West, not an all-new store. The acreage and square footage match the county figures. The site already holds the Walmart store and its parking lot.

According to that coverage, the added space would mainly enlarge the grocery section and create an area for staging online pickup and delivery orders. Walmart also asked for exceptions to local zoning rules. These include less front parking setback, more building coverage, fewer parking spaces than the code requires, and more signs than allowed.

No report of a vote, approval or denial was found.

What it could mean nearby

Where it stands

Walmart applied to the Toms River Planning Board for preliminary and final site plan approval plus variances. No decision was found online. After a hearing the board usually votes, and an approval is followed by construction permits.

Want to weigh in? The Toms River Township Planning Board decides this application. Residents can comment at its public hearing, held at the municipal complex on Washington Street.

Who's behind it

Walmart · Walmart is a national retailer that operates the existing store on this site. Bohler Engineering is the engineering firm named on the county filing.

Around the web

Planning terms explained
Site plan
A detailed layout showing a building, parking, driveways, lighting and landscaping that the township must approve.
Preliminary and final major site plan approval
The board's approval of both the overall design and the construction-level details for a large project.
Bulk (C) variance
Permission to depart from size or placement rules, such as setbacks, building coverage or parking counts.
Setback
The minimum distance a building or parking area must stay from a property line.
Building coverage
The share of the lot covered by buildings.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $10.6M