About this project

A site plan for a synagogue on James Street in Lakewood Township, about 16,762 sq ft on 0.44 acres.

Official description: Synagogue

Applicant
Knesseth Bais Yaakov of Lakewood, Inc.
Engineer / designer
Newlines
Plan type
Site plan
Land use
P
Status
Approved with Contingency

Filing history

  • 2024-06-19 · #LAT1122C.01 · Site plan · 16,762 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

Knesseth Bais Yaakov of Lakewood, Inc. proposes a synagogue on James Street in Lakewood Township. County records describe a building of about 16,762 square feet on a lot of roughly 0.44 acres, which is a little under half an acre. Newlines is listed on the filing alongside the congregation. The county records do not say what is on the site today.

Township planning board records list a request for preliminary and final major site plan approval for a synagogue on this lot (Block 338, Lot 1). A separate township decision notice, dated 2026 by its filename, mentions an extension of a minor subdivision for the same congregation and lot, creating two lots. The search snippets could not be opened in readable form, so the dates and outcomes are unconfirmed. No news coverage, opposition or developer project page was found.

What it could mean nearby

Where it stands

County records show a site plan filing in June 2024, and township records point to a subdivision extension decision in 2026. The final status of the site plan could not be confirmed. If it is approved, the usual next steps are meeting any approval conditions, obtaining construction permits, and then building.

Want to weigh in? The Lakewood Township Planning Board normally decides site plans at public meetings, and residents can usually comment at the hearing; agendas are posted on the township website.

Who's behind it

Knesseth Bais Yaakov of Lakewood, Inc. · A Lakewood-based congregation named as the applicant on the filing; Newlines is also listed, and no official website was found.

Around the web

Planning terms explained
Site plan
A detailed drawing showing the building, parking, driveways, drainage and landscaping on a lot, which the township reviews before construction.
Preliminary and final major site plan
A request to approve both the general design and the construction-level details of a larger project in a single step.
Minor subdivision
A simple split of one lot into a small number of lots without new streets.
Notice of decision
A public notice announcing what a township board decided on an application.
Block and lot
The numbers the township tax map uses to identify a specific parcel.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $5.9M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →