PlannedNearby

Ocean County · Jackson Township · #JT1771

Commercial site plan, Whitesville Road

Whitesville Road, Jackson Township, NJ · 57,375 sq ft non-residential, retail & commercial · 5.0 acres

About this project

A commercial site plan covering about 57,375 sq ft on 5.01 acres is proposed off Whitesville Road in Jackson Township.

Applicant
Whitesville Development, LLC
Engineer / designer
Professional Design Services, LLC
Plan type
Site plan
Land use
Commercial
Status
Approved with Contingency

Filing history

  • 2024-05-01 · #JT1771 · Site plan · 57,375 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

A commercial site plan was filed with Ocean County for about 57,375 square feet of retail and commercial space on roughly 5.01 acres along Whitesville Road in Jackson Township. That is about the size of a mid-sized shopping center or several large stores combined.

The county record does not say what stores or businesses would occupy the space. It also does not say what is on the land now or how many buildings are planned. No news coverage, township agenda, hearing notice or developer page about this specific project was found online, so nothing is known about approvals or opposition.

The filing lists Whitesville Development, LLC and Professional Design Services, LLC. The most recent county filing is dated May 2024.

What it could mean nearby

Where it stands

The county has a filing dated May 2024. No township approval status was found online. A site plan like this normally goes to the township planning board for review and a public hearing, and construction permits follow if it is approved.

Want to weigh in? The Jackson Township planning board would normally hear a site plan application. Neighbors can usually comment at its public hearing, and the township clerk or land use office can confirm the meeting date.

Who's behind it

Whitesville Development, LLC

Planning terms explained
Site plan
A detailed drawing showing where buildings, parking, driveways, lighting and drainage would go on a property.
Planning board
A township board that reviews development applications and holds public hearings before deciding.
Non-residential square footage
The total floor area of the buildings that are not homes, such as stores and offices.
Stormwater management
Systems such as basins and drains that handle rain runoff from paved and built areas.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $11.5M