PlannedNearby

Ocean County · Barnegat Township · #BAT278C

Warehouse, South Main Street

South Main Street, Barnegat Township, NJ · 35,488 sq ft non-residential, warehouse & storage · 5.5 acres

About this project

A site plan for a warehouse on about 5.5 acres on South Main Street in Barnegat Township, with about 35,500 sq ft proposed.

Official description: Warehouse

Applicant
Simply Storage Barnegatt, LLC
Engineer / designer
Dynamic Engineering Consultants, P.C.
Plan type
Site plan
Land use
Industrial
Status
Approved with Contingency

Filing history

  • 2026-03-04 · #BAT278C · Site plan · 35,488 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

Simply Storage Barnegat, LLC has applied for a site plan for a warehouse-style building of about 35,500 square feet on roughly 5.5 acres on South Main Street in Barnegat Township. Township planning board papers describe a self-storage expansion at 220 South Main Street, filed under the name Public Storage Expansion. It appears to be this project, because the applicant and street match.

The township's completeness review asked the applicant to explain the site's history and operations and noted a waiver request. A November 2025 planning board agenda listed approval of a preliminary and final site plan for the project. That agenda does not show whether the board voted or what the result was. No news coverage, opposition or confirmed occupant was found beyond the storage use named in the township papers.

What it could mean nearby

Where it stands

The project reached the Barnegat Township Planning Board, which had it on a November 2025 agenda. The board's decision was not confirmed, and a county filing dated March 2026 suggests county-level review. After board approval, the usual steps are county and state permits, then construction.

Want to weigh in? The Barnegat Township Planning Board decides local site plan applications and takes public comment at its meetings, whose agendas are posted on the township website; the Ocean County Planning Board also reviews the plan.

Who's behind it

Simply Storage Barnegat, LLC · The applicant is a limited liability company named on the filing. Its engineer is Dynamic Engineering Consultants, P.C., and no official company website was found.

Around the web

Planning terms explained
Site plan
A detailed drawing showing the layout of buildings, parking, drainage and access on a property.
Preliminary and final major site plan
A board approval that covers both the general design and the final construction details in a single step.
Completeness review
A staff check that an application has all required documents before the board hears it.
Waiver
Permission to depart from a specific township design requirement.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.6M