Ocean County · Jackson Township · #202601553
Accessory structure, Block 301 Lot 5
Jackson Township, NJ · 18,000 sq ft non-residential, other
About this project
An accessory structure of about 18,000 sq ft on Block 301, Lot 5 in Jackson Township, with a reported construction cost of $193,500.
Official description: Accessory buildings and miscellaneous structures; reported construction cost $193,500
- Plan type
- Building permit (new construction)
- Land use
- Accessory buildings and miscellaneous structures
- Status
- Permit
Filing history
- 2026-07-22 · #202601553 · Building permit (new construction) · 18,000 sq ft
The full picture AI research · Nov 1, 2026
County records list an accessory structure of about 18,000 square feet on Block 301, Lot 5 in Jackson Township, Ocean County. An accessory structure is a secondary building that supports a main use on the property, such as a storage building, garage or similar outbuilding. The county lists its reported construction cost as $193,500.
The records do not say what the building will be used for, who will own or occupy it, or what is on the lot now. The county classifies it as non-residential, with the type listed as "Other."
No developer website, news coverage, township meeting agenda, hearing notice or state permit could be tied to this specific lot. This explanation therefore relies on the county facts alone.
What it could mean nearby
- Use, traffic and access effects cannot be judged because the records do not state what the building is for.
- The reported cost is low for 18,000 square feet, which suggests a simple building such as storage or an agricultural-type structure. This is an inference, not a finding in the records.
Where it stands
A county filing was recorded on 2026-07-22. No township board approval, hearing or decision could be found online. Accessory structures often go through a building permit review and sometimes a zoning or planning board review, depending on size and use.
- Jul 22, 2026 Latest county filing for the accessory structure
Want to weigh in? The township planning or zoning board would handle any hearing, and the township's land use office can say whether this lot has an application pending.
Planning terms explained
- Accessory structure
- A secondary building on a lot that supports the main use, such as a storage building or garage.
- Block and Lot
- The numbers the township tax map uses to identify a specific parcel of land.
- Non-residential
- Space used for something other than housing, such as storage, business or institutional use.
- Zoning board
- A local board that rules on requests to vary from zoning rules.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.6M
- ~180 roofing squares (assumes 1 story)
- ~45 tons of cooling (rule of thumb 400 sq ft/ton)