Monmouth County · Wall Township · #26-1329
Business building, 2110 Hwy 35
2110 Hwy 35, Wall Township, NJ · 53,350 sq ft non-residential, office
About this project
A new business-use building of about 53,350 sq ft at 2110 Highway 35 in Wall Township. The reported construction cost is about $12.2 million.
Official description: Business Uses; reported construction cost $12,192,845
- Plan type
- Building permit (new construction)
- Land use
- Business Uses
- Status
- Permit
Filing history
- 2026-09-25 · #26-1329 · Building permit (new construction) · 53,350 sq ft
The full picture AI research · Nov 2, 2026
A new business-use building of about 53,350 square feet is proposed at 2110 Highway 35 in Wall Township, Monmouth County. County records classify it as office space and put the reported construction cost at about $12.2 million.
The records do not say what is on the site now. They also do not name a developer or a future occupant. Searches of news coverage, township agendas and developer sites found nothing clearly about this project, so no opposition, approvals or tenants are known from public sources.
For scale, 53,350 square feet is several times larger than a typical small suburban office building. The county's most recent filing is dated September 25, 2026.
What it could mean nearby
- Highway 35 is a busy state highway, so a building this size could add car trips and may need state driveway-access review, though no traffic study was found.
- Office use could bring daytime jobs to the area. The number of jobs is not stated in the records.
- No homes are proposed, so the project would not directly add students to local schools.
Where it stands
The county has received a filing for the project, which suggests it is in the local review stage. Next, the township's land-use board would typically hold a public hearing and vote on the site plan and any variances. No local hearing date was found.
- Sep 25, 2026 Latest county planning filing recorded for the project
Planning terms explained
- Site plan
- A set of drawings showing how a property will be laid out, including the building, parking, driveways, lighting and drainage.
- Variance
- Permission to depart from a zoning rule, such as a height or setback limit.
- Non-residential square footage
- The total floor area of the building used for business rather than housing.
- County planning board
- A county body that reviews development near county roads and drainage and records filings, though the township makes the main land-use decision.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 2, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Wall Township land-use board (planning board or zoning board of adjustment) would usually decide, and neighbors can comment at its public hearing. Meeting notices are posted by the township.
This is a construction permit, which comes after the town's land use approvals, so the public hearing stage is usually over.
- New projects in Wall Township go before its planning board or zoning board of adjustment at public hearings, where anyone can speak and the testimony goes on the record. Watch the agendas for the next ones.
Find Wall Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $16.0M
- ~177 roofing squares (assumes 3 stories)
- ~133 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →