Monmouth County · Tinton Falls Borough · #20240491
Low-hazard storage building, Tinton Falls
Tinton Falls Borough, NJ · 10,500 sq ft non-residential, warehouse & storage
About this project
A building permit covers a new 10,500 sq ft low-hazard storage building on a lot in Tinton Falls Borough, Monmouth County.
Official description: Storage building, low hazard; reported construction cost $1,285,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, low hazard
- Status
- Certificate
Filing history
- 2024-06-11 · #20240491 · Building permit (new construction) · 10,500 sq ft
The full picture AI research · Nov 1, 2026
County records show a building permit for a new storage building of about 10,500 square feet in Tinton Falls Borough, Monmouth County. The permit describes it as a low-hazard storage building. That generally means it would hold ordinary goods and materials that don't pose a significant fire or explosion risk.
The records don't give the street address, what is on the lot now, or who will use the building. A web search found no news coverage, borough meeting agenda, hearing notice or developer page that clearly matches this project.
The permit was filed with the county on 2024-06-11. A building permit usually comes after the local land-use approvals, if any were required, so construction may be underway or finished.
What it could mean nearby
- Impact on traffic, jobs, utilities or schools can't be judged because the records give no site, tenant or use details.
- Warehouse and storage buildings of this size usually bring occasional truck and delivery trips rather than steady commuter traffic.
Where it stands
A building permit was recorded by the county on 2024-06-11. Construction normally follows once a permit is issued, then inspections, and then a certificate of occupancy before the building can be used.
- Jun 11, 2024 Latest county filing: building permit for a new 10,500 sq ft low-hazard storage building
Want to weigh in? Tinton Falls Borough's planning board or zoning board of adjustment would hear any site plan or variance applications, and the borough's meeting agendas list when they meet. For a project that already has a permit, the borough construction office is the place to ask about it.
Planning terms explained
- Building permit
- Official permission from the local construction office to build, based on plans that meet the building code.
- Low-hazard storage
- A building-code category for storage of goods that carry little fire or explosion risk.
- Site plan
- A drawing and application showing how a lot will be laid out, including the building, parking, drainage and access.
- Certificate of occupancy
- The final approval confirming a finished building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $1.4M
- ~105 roofing squares (assumes 1 story)
- ~26 tons of cooling (rule of thumb 400 sq ft/ton)