PlannedNearby

Monmouth County · Manalapan Township · #20252628

Accessory structures, Block 78, Lot 12.02

Manalapan Township, NJ · 294,500 sq ft non-residential, other

About this project

A building permit for accessory structures on Block 78, Lot 12.02 in Manalapan Township, covering about 294,500 square feet with a reported cost near $10 million.

Official description: Accessory buildings and miscellaneous structures; reported construction cost $10,075,000

Plan type
Building permit (new construction)
Land use
Accessory buildings and miscellaneous structures
Status
Permit

Filing history

  • 2025-10-21 · #20252628 · Building permit (new construction) · 294,500 sq ft
  • 2025-10-02 · #20252458 · Building permit (new construction) · 302,250 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records show a building permit for accessory structures on Block 78, Lot 12.02 in Manalapan Township. The work covers about 294,500 square feet of non-residential space and has a reported cost near $10 million. "Accessory structures" usually means buildings that support a main use, but the record does not say what they are or who will use them.

No developer, tenant, news story or township hearing record could be tied to this lot. The record does not describe what is on the site now.

A marketing page for a 294,500-square-foot warehouse in Manalapan has the same size. It gives no block, lot or address, so it is not treated as this project.

What it could mean nearby

Where it stands

A building permit filing was recorded with the county on 2025-10-21. Permits like this usually follow local land-use approvals, and construction inspections usually come next. No township hearing record for this lot was found.

Want to weigh in? Residents can ask the Manalapan Township Planning and Zoning office whether this lot has a board application, and can comment at public Planning Board meetings if one is scheduled.

Planning terms explained
Accessory structure
A building or structure that supports the main use of a property rather than being the main building.
Block and lot
The numbers the township tax map uses to identify a specific parcel of land.
Building permit
Official permission to start construction, issued after plans are checked against building codes.
Non-residential
Space used for business, industrial or other purposes rather than housing.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $58.9M