Middlesex County · Woodbridge Township · #20253486
Storage building at 750 Martin St
750 Martin St, Woodbridge Township, NJ · 84,000 sq ft non-residential, warehouse & storage
About this project
A new storage building of about 84,000 sq ft is proposed at 750 Martin St in Woodbridge Township.
Official description: Storage building, moderate hazard; reported construction cost $1,876,900
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2025-12-03 · #20253486 · Building permit (new construction) · 84,000 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 84,000 square feet is proposed at 750 Martin St in Woodbridge Township, Middlesex County. County planning records classify it as warehouse and storage space. That is roughly the size of one and a half football fields of floor area.
The records do not say what is on the site now, who would use the building, or whether it would be self-storage or warehouse space for businesses. The latest county filing is dated December 3, 2025.
No news coverage, township meeting agendas, hearing notices or developer pages about this project were found. The details here come only from the county record.
What it could mean nearby
- Truck and delivery traffic on Martin St is possible, as warehouse and storage buildings usually bring it. The records give no traffic figures.
- A small number of jobs could come with the building. The records give no estimate.
- No information was found on open space, schools or utilities.
Where it stands
The project has a county planning filing from December 2025. No township approval or hearing could be confirmed online. Projects like this usually go to the township land use board for site plan review next, and sometimes for variances too.
- Dec 3, 2025 Latest county planning filing for the project
Want to weigh in? Woodbridge Township's planning or zoning board would usually decide on an application like this. Residents can generally comment at its public hearing, and the township's Planning & Development office can confirm the schedule.
Planning terms explained
- Site plan review
- A local board's check of a building's layout, parking, drainage and access before it can be built.
- Variance
- Permission to depart from a local zoning rule, such as a limit on height or size.
- Non-residential square footage
- The total floor area of a building that is not used for housing.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $10.9M
- ~840 roofing squares (assumes 1 story)
- ~210 tons of cooling (rule of thumb 400 sq ft/ton)