Middlesex County · Piscataway Township · #20252042+A
88 Centennial Ave
88 Centennial Ave, Piscataway Township, NJ · 55,031 sq ft non-residential, retail & commercial
About this project
A hotel building at 88 Centennial Ave in Piscataway Township, Middlesex County, NJ, about 55,031 sq ft. The reported construction cost is about $13.0 million.
Official description: Hotels, motels, boarding houses, etc.; 55,031 sq ft; reported construction cost $13,034,000
- Plan type
- Building permit (new construction)
- Land use
- Hotels, motels, boarding houses, etc.
- Status
- Certificate
Filing history
- 2025-11-18 · #20252042+A · Building permit (new construction)
The full picture AI research · Nov 1, 2026
A hotel building of about 55,031 square feet is proposed at 88 Centennial Ave in Piscataway Township, Middlesex County. County records put the construction cost at roughly $13.0 million. The records classify it as retail and commercial space.
The records do not say how many rooms it would have, which hotel brand would run it, or what is on the site now. Centennial Ave is a busy commercial corridor with offices and other hotels nearby.
No news coverage, township agendas, minutes or developer pages specific to this project were found online. No opposition, approvals or named occupant could be confirmed. This explanation rests on the county facts alone.
What it could mean nearby
- A hotel could add some jobs, both during construction and once it opens. The records do not give a number.
- Traffic and parking effects are unknown. Any site plan review would normally look at driveways and traffic on Centennial Ave.
- The records do not mention homes, schools or open space, so no effects on those can be stated.
Where it stands
The latest county filing is dated 2025-11-18, and no approval or hearing outcome was found online. A project like this usually needs township planning board review of its site plan, then construction permits.
- Nov 18, 2025 Latest filing in the county planning records
Want to weigh in? Site plans in Piscataway are usually decided by the township planning board, which holds public hearings. Residents can check the township website for agendas and hearing notices.
Planning terms explained
- Site plan
- A detailed layout showing a building, parking, driveways and landscaping, which the township reviews before construction.
- Planning board
- A local public body that reviews development applications and holds public hearings on them.
- Non-residential square footage
- Floor area used for businesses, such as hotels, offices or stores, rather than homes.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $11.0M
- ~550 roofing squares (assumes 1 story)
- ~137 tons of cooling (rule of thumb 400 sq ft/ton)