PlannedNearby

Middlesex County · Old Bridge Township · #25-0211

Accessory structures, Block 22001.22, Lot 2.11

Old Bridge Township, NJ · 36,000 sq ft non-residential, other

About this project

Accessory buildings and miscellaneous structures on Block 22001.22, Lot 2.11 in Old Bridge Township, about 36,000 sq ft, with a reported construction cost of $3,350,001.

Official description: Accessory buildings and miscellaneous structures; reported construction cost $3,350,001

Plan type
Building permit (new construction)
Land use
Accessory buildings and miscellaneous structures
Status
Permit

Filing history

  • 2025-02-04 · #25-0211 · Building permit (new construction) · 36,000 sq ft
  • 2025-02-04 · #25-0212 · Building permit (new construction) · 36,000 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The county's planning records list accessory buildings and miscellaneous structures on Block 22001.22, Lot 2.11 in Old Bridge Township. Together they total about 36,000 square feet, and the reported construction cost is about $3.35 million. "Accessory" means the buildings support a larger use on the site, such as storage, equipment or utility structures. They are not the main building.

The records do not say what is on the lot now, who will use the buildings, or exactly what each structure is for. No developer page, news story, or township agenda or hearing notice could be tied to this lot. The latest county filing is dated February 4, 2025.

What it could mean nearby

Where it stands

The county filing from early February 2025 is the only record found, and no township approval status was located. Projects like this usually go through a township site plan or construction permit review next, unless they have already been approved.

Want to weigh in? Residents can check Old Bridge Township Planning Board agendas, or ask the township planning office whether this lot has an application on file.

Planning terms explained
Accessory structure
A building or structure that supports the main use of a property, such as a storage building or equipment shed.
Block and lot
The numbers the township tax map uses to identify a specific parcel of land.
Site plan
A detailed layout showing buildings, parking, drainage and access, which the township reviews before construction.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $7.2M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →