PlannedNearby

Mercer County · West Windsor Township · #20250073

Storage building in West Windsor Township

West Windsor Township, NJ · 326,087 sq ft non-residential, warehouse & storage

About this project

A large storage building of about 326,087 sq ft on Block 22, Lot 5 in West Windsor Township, with a reported construction cost of about $11.3 million.

Official description: Storage building, moderate hazard; Other Non-Residential; reported construction cost $11,345,000

Plan type
Building permit (new construction)
Land use
Other Non-Residential
Status
Permit

Filing history

  • 2025-01-10 · #20250073 · Building permit (new construction) · 326,087 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The project is a single-story warehouse of about 326,087 square feet, known as Windsor 8 Logistics Center. It is on Block 22, Lot 5, at 399 Princeton-Hightstown Road (Route 571) in West Windsor, next to the East Windsor border. Trade press names Brookfield Properties as the developer. The county puts the construction cost at about $11.3 million.

The building is planned with about 57 loading dock doors, 2 drive-in doors, 163 car spaces and 73 trailer spaces. It appears to be built on speculation, meaning no tenant has been announced. The West Windsor Planning Board took up the site plan application in 2022. An East Windsor notice from October 2024 says the township had approved it and that some site clearing had started.

East Windsor officials and some West Windsor residents oppose it. Their concerns are stormwater and flooding, truck traffic, zoning and environmental effects.

What it could mean nearby

Where it stands

The township planning board took up the application in 2022, and an October 2024 notice describes it as approved with some final approvals still pending. Trade press in September 2024 reported a contractor was lined up, with completion expected around 2025. Because the latest county filing is from January 2025, construction may be underway or finished, but this was not confirmed.

Want to weigh in? The West Windsor Planning Board handled the site plan. East Windsor's notice asks residents to write to the Mercer County Commissioners, because county review is part of the remaining approvals.

Who's behind it

Brookfield Properties · Brookfield Properties is a commercial real estate developer and owner, and trade press names it as developer of this logistics center. The 2022 township agenda lists the applicant as JDN Enterprises, LLC.

Around the web

Planning terms explained
Site plan
A detailed layout showing the building, parking, drainage and access that the town reviews before construction.
Preliminary and final major site plan
A request for both stages of approval for a large project at once.
Spec building
A building put up without a signed tenant, in the hope of leasing it afterward.
ROM-3 zone
The township zoning district for this site, according to planning board agendas.
Stormwater
Rain runoff from roofs and pavement that has to be collected and managed so it does not cause flooding.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $42.4M