Mercer County · Robbinsville Township · #20260415
1091 Route 130
1091 Route 130, Robbinsville Township, NJ · 30,204 sq ft non-residential, warehouse & storage
About this project
A new moderate-hazard storage building of about 30,204 sq ft at 1091 Route 130 in Robbinsville Township.
Official description: Storage building, moderate hazard; reported construction cost $350,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2026-05-21 · #20260415 · Building permit (new construction) · 30,204 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 30,204 square feet is proposed at 1091 Route 130 in Robbinsville Township, Mercer County. County records describe it as a "moderate-hazard" storage building. That is a fire-code category for buildings that hold materials that burn fairly readily. It does not mean the building is dangerous.
The records don't say who would use it, what is on the site now, or whether it is a warehouse or a self-storage facility. No news coverage, township agenda or minutes, developer page or state permit was found for this address. The county's latest filing is dated 2026-05-21.
Other storage and warehouse uses already sit along this stretch of Route 130, which is a busy commercial corridor.
What it could mean nearby
- Traffic: a building this size would likely add truck and vehicle trips on Route 130. The size of the effect is not known from the records.
- Jobs: a small number of warehouse or storage jobs is possible, but no figures were found.
- Utilities and open space: the records give no details about either.
Where it stands
The county has a filing on record dated 2026-05-21. No township approval was found online. Next steps usually include a review by the township land use board and county review of the site plan, followed by construction permits if approved.
- May 21, 2026 Latest filing in the Mercer County planning records
Want to weigh in? Robbinsville Township's land use board usually decides applications like this at public meetings, where residents can comment. The township posts agendas and notices on its website.
Planning terms explained
- Moderate-hazard storage
- A fire-code category for buildings that store materials that burn at a moderate rate. It is a building-safety label and does not mean the site is unsafe.
- Site plan
- A detailed drawing and review of how a property will be laid out, including the building, parking, drainage and access.
- Land use board
- The local board that reviews development applications and decides whether to approve them.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.9M
- ~302 roofing squares (assumes 1 story)
- ~75 tons of cooling (rule of thumb 400 sq ft/ton)