PlannedNearby

Mercer County · Hamilton Township · #20242812

825 Sloan Ave storage building

825 Sloan Ave, Hamilton Township, NJ · 420,000 sq ft non-residential, warehouse & storage

About this project

New moderate-hazard storage building of about 420,000 sq ft at 825 Sloan Ave in Hamilton Township.

Official description: Storage building, moderate hazard; reported construction cost $45,423,583

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2024-08-07 · #20242812 · Building permit (new construction) · 420,000 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The project is a new warehouse of about 420,000 square feet at 825 Sloan Ave in Hamilton Township. It sits on the former Congoleum flooring plant site, which closed in 2014 and was later cleared. The site had known contamination.

The developer, Lincoln Equities Group, is building the warehouse without a tenant lined up. News coverage describes 40-foot ceilings, 84 loading docks and a large parking lot. The building could hold one user or several. A $60.8 million construction loan was announced in August 2024.

Township approval was won after legal disputes. The Planning Board first denied the plan, a court overturned that, and the plan was approved in 2023. Construction had started by 2025, and a late-2025 report said completion was expected in the coming months. No tenant has been publicly named.

What it could mean nearby

Where it stands

The project appears to be approved and built or nearly built, with completion reported as expected around late 2025 to early 2026. What usually follows is final inspections and occupancy approval, then a tenant moving in. Any tenant fit-out or change in use could need further township review.

Who's behind it

Lincoln Equities Group · A New Jersey-based real estate developer that builds and owns industrial and logistics properties, including this speculative warehouse.

Around the web

Planning terms explained
Speculative building
A building constructed before a tenant has signed on.
Redevelopment plan
A township-adopted plan guiding how a former industrial or contaminated site can be reused.
Planning Board
The local body that reviews and approves site plans and subdivisions.
Loading dock
A bay where trucks back up to load and unload goods.
Brownfield
A previously used industrial site that may have contamination needing cleanup.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Hamilton Township Planning Board handled the approvals and meets publicly, with agendas on the township website; since the project is already approved, there may be few formal chances to comment unless changes are proposed.

This is a construction permit, which comes after the town's land use approvals, so the public hearing stage is usually over.

Find Hamilton Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $54.6M