PlannedNearby

Hudson County · Bayonne City · #25-07-102

23 Evergreen St accessory structures

23 Evergreen St, Bayonne City, NJ · 13,834 sq ft non-residential, other

About this project

Accessory buildings and miscellaneous structures at 23 Evergreen St in Bayonne, totaling 13,834 sq ft with a reported cost of about $2.6 million.

Official description: Accessory buildings and miscellaneous structures; reported construction cost $2,597,000

Plan type
Building permit (new construction)
Land use
Accessory buildings and miscellaneous structures
Status
Permit

Filing history

  • 2025-07-25 · #25-07-102 · Building permit (new construction) · 13,834 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

The county record describes accessory buildings and miscellaneous structures at 23 Evergreen St in Bayonne. Together they total about 13,834 square feet of non-residential space, with a reported cost of roughly $2.6 million. "Accessory" means the structures support a main use on the property, such as storage or utility buildings, instead of being the main building.

The county record does not say what is on the site now, who will use the new structures, or what they will be used for. Searches found no news coverage, developer page, Planning Board agenda item, or hearing notice that clearly matches this address. Details beyond the county facts are therefore unknown.

What it could mean nearby

Where it stands

The county filed the record on 2025-07-25. No city hearing or approval for this address was found online. Projects like this usually need a city zoning review and building permits, and larger or non-conforming ones also go before the Planning Board.

Planning terms explained
Accessory structure
A secondary building on a property that supports the main use, such as storage or a utility building.
Non-residential
Space used for something other than housing, such as commercial, industrial, or storage use.
Zoning permit
City approval confirming that a proposed structure meets local rules on location, size, and use.
Setback
The minimum distance a building must stay from property lines.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: In Bayonne, the Planning Board hears development applications at public meetings, and the city's Planning, Zoning and Development department can say whether this address has an application pending.

This is a construction permit, which comes after the town's land use approvals, so the public hearing stage is usually over.

Find Bayonne City's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $2.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →