Gloucester County · Washington Township · #020251041
2760 Glassboro Crosskeys
2760 Glassboro Crosskeys, Washington Township, NJ · 41,316 sq ft non-residential, warehouse & storage
About this project
A 41,316 sq ft low-hazard storage building is permitted at 2760 Glassboro Crosskeys in Washington Township.
Official description: Storage building, low hazard; Other Non-Residential; reported construction cost $820,000
- Plan type
- Building permit (new construction)
- Land use
- Other Non-Residential
- Status
- Permit
Filing history
- 2025-06-18 · #020251041 · Building permit (new construction) · 41,316 sq ft
The full picture AI research · Nov 1, 2026
A 41,316-square-foot building for low-hazard storage is permitted at 2760 Glassboro Crosskeys in Washington Township, Gloucester County. County records classify it as a warehouse and storage use. "Low-hazard" means the stored goods are not expected to be especially flammable or dangerous.
The records do not say what is on the site now. They also do not name who will use the building or what will be stored. A web search found no news coverage, township meeting items, hearing notices or developer pages clearly about this site. No opposition or approval hearings were found online.
The latest county filing is dated June 18, 2025. The word "permitted" suggests the project has cleared at least the main county-level review steps.
What it could mean nearby
- A warehouse of this size could bring some truck and delivery traffic to Glassboro Crosskeys, but no traffic study was found.
- Storage buildings usually create few permanent jobs. No job figures were found for this project.
- No information was found on housing, schools, open space or utilities.
Where it stands
County records describe the building as permitted, with the latest filing on 2025-06-18. Next steps usually include construction permits, inspections and, once the building is finished, a certificate of occupancy.
- Jun 18, 2025 Latest county planning filing for the project
Want to weigh in? No public hearing was found. Residents with questions can contact the Washington Township planning or zoning office, which handles local land-use matters.
Planning terms explained
- Low-hazard storage
- A building-code category for storage of goods that burn slowly or are not especially dangerous.
- Non-residential square footage
- The total floor area of the building, which contains no homes.
- Certificate of occupancy
- A township document confirming a finished building is safe and allowed to be used.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $5.4M
- ~413 roofing squares (assumes 1 story)
- ~103 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →