Gloucester County · Harrison Township · #024000016
245 Cedar Rd
245 Cedar Rd, Harrison Township, NJ · 12,480 sq ft non-residential, other
About this project
An accessory building of about 12,480 sq ft is proposed at 245 Cedar Road in Harrison Township.
Official description: Accessory buildings and miscellaneous structures; reported construction cost $13,923
- Plan type
- Building permit (new construction)
- Land use
- Accessory buildings and miscellaneous structures
- Status
- Permit
Filing history
- 2024-04-04 · #024000016 · Building permit (new construction) · 12,480 sq ft
The full picture AI research · Nov 1, 2026
County planning records show a proposal for an accessory building of about 12,480 square feet at 245 Cedar Road in Harrison Township, Gloucester County. An accessory building is a secondary structure on a property, such as a barn, warehouse, garage or storage building. It is not the main use of the site.
The records don't say what the building will be used for, who will use it, or what is on the site now. The county classifies the project as "Other," with 12,480 sq ft of non-residential space and no homes. That is a large building, well over ten times the size of a typical house garage.
No news coverage, township meeting agendas, hearing notices or developer pages were found for this address. Opposition, approvals and the future occupant are unknown.
What it could mean nearby
- The records list no homes, so the proposal would not directly add households or school students.
- A building this size could bring some vehicle trips, such as deliveries or workers, depending on its use. The records don't say what the use is.
- Stormwater runoff, utilities and the amount of paved or covered land would likely be reviewed by the township. No details were found.
Where it stands
The latest county filing is dated April 4, 2024. No public record of a decision was found. Projects like this usually go next to township review, possibly by the planning board or zoning board, before permits are issued.
- Apr 4, 2024 Latest county planning filing for the proposed accessory building
Want to weigh in? Harrison Township's planning or zoning board would likely decide, and residents can usually comment at its public meetings. Check the township website (harrisontwp.us) for schedules.
Planning terms explained
- Accessory building
- A secondary structure on a property that supports its main use, such as a barn, garage or storage building.
- Non-residential
- Space used for something other than housing, such as storage, business or agriculture.
- Planning board
- A local public body that reviews development plans and decides whether they meet township rules.
- Zoning board
- A local body that can grant exceptions (variances) from zoning rules for a property.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.5M
- ~124 roofing squares (assumes 1 story)
- ~31 tons of cooling (rule of thumb 400 sq ft/ton)