Camden County · Winslow Township · #202401806
105 North Route 73
105 North Route 73, Winslow Township, NJ · 18,146 sq ft non-residential, warehouse & storage
About this project
A new low-hazard storage building of about 18,146 sq ft is proposed at 105 North Route 73 in Winslow Township.
Official description: Storage building, low hazard; Other Non-Residential; reported construction cost $210,010
- Plan type
- Building permit (new construction)
- Land use
- Other Non-Residential
- Status
- Certificate
Filing history
- 2024-11-04 · #202401806 · Building permit (new construction) · 18,146 sq ft
The full picture AI research · Nov 1, 2026
A new low-hazard storage building of about 18,146 square feet is proposed at 105 North Route 73 in Winslow Township, Camden County. County planning records classify it as a warehouse and storage use. That is roughly the footprint of a few large retail units.
County records do not say what is on the site now, who would use the building, or what the storage would hold. No news coverage, township agenda, hearing notice or developer page about this address was found. Nearby storage proposals in Winslow, such as those on Cross Keys Road and Sicklerville Road, are separate projects and are not treated as related.
What it could mean nearby
- Route 73 is a busy state highway, so truck and vehicle access would likely be reviewed. The records do not give traffic numbers.
- Storage and warehouse uses usually bring few permanent jobs. The records give no job estimate.
- The records give no information on utilities, schools or open space.
Where it stands
A filing was made with the county on 2024-11-04. No township approval or hearing result was found online. Projects like this typically go to the township planning or zoning board for site plan review, and construction permits follow if approved.
- Nov 4, 2024 Latest filing in the county planning records
Want to weigh in? The Winslow Township land use board that handles site plans would usually decide, and residents can speak at its public meetings. Check the township's website for agendas and hearing notices.
Planning terms explained
- Site plan review
- A local board's check of a project's layout, parking, drainage, lighting and access before it can be built.
- Warehouse & storage
- A land-use category for buildings used to store goods or materials, rather than to sell them or to house people.
- Low-hazard
- A building-code term for a use that does not involve significant amounts of dangerous or flammable materials.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.4M
- ~181 roofing squares (assumes 1 story)
- ~45 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →