Camden County · Cherry Hill Township · #20233778+C
Educational building, 31 Maple Ave
31 Maple Ave, Cherry Hill Township, NJ · 12,994 sq ft non-residential, school
About this project
A building permit covers a new educational building of about 12,994 sq ft at 31 Maple Avenue in Cherry Hill Township, Camden County.
Official description: Educational; reported construction cost $1,100,000
- Plan type
- Building permit (new construction)
- Land use
- Educational
- Status
- Certificate
Filing history
- 2024-06-10 · #20233778+C · Building permit (new construction) · 12,994 sq ft
The full picture AI research · Nov 1, 2026
County building-permit records show a new educational building of about 12,994 square feet planned at 31 Maple Avenue in Cherry Hill Township. The permit is for a school-type use. It is a non-residential building, so it does not include homes.
The search found no news coverage, developer page or meeting minutes that clearly describe this exact building. Search results only suggest that the address has long been a private religious school campus. They also suggest that earlier township planning board applications dealt with expanding that school. Those results could not be checked directly, so they are not cited. The permit may be part of a school expansion, but that is not confirmed.
What it could mean nearby
- A school building can change daily drop-off and pick-up traffic on Maple Avenue and nearby streets, but no traffic study was found.
- No records found show new homes, public open space changes or utility upgrades.
Where it stands
A building permit was filed with the county, with the latest filing dated June 10, 2024. A permit usually means local land-use approvals are done or were not needed. Construction inspections and a certificate of occupancy usually come next.
- Jun 10, 2024 Latest county filing for the building permit
Planning terms explained
- Building permit
- Official permission from the local government to construct a building to approved plans and code.
- Non-residential
- A building used for something other than housing, such as a school, office or store.
- Certificate of occupancy
- A document issued after final inspections that says a building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.5M
- ~64 roofing squares (assumes 2 stories)
- ~32 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →