PlannedNearby

Burlington County · Florence Township · #20260622

Storage building, Block 158 Lot 7

Florence Township, NJ · 728,204 sq ft non-residential, warehouse & storage

About this project

A moderate-hazard storage building is proposed on Block 158, Lot 7 in Florence Township, Burlington County, NJ, with about 728,204 sq ft of floor area.

Official description: Storage building, moderate hazard; reported construction cost $400,000

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2026-09-01 · #20260622 · Building permit (new construction) · 728,204 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 2, 2026

A very large storage and warehouse building is proposed at 1200 John Galt Way in Florence Township, on Block 158, Lot 7. County records give its floor area as about 728,204 square feet. That is roughly the footprint of more than twelve football fields.

Township planning board records show the site as a Phase 2 project by Whitesell Construction. An agenda for August 27, 2024 lists an amended preliminary major site plan for a building of that size. Minutes from September 23, 2025 show a major final site plan application for the same lot. The documents could not be read in full, so the outcomes of those hearings and any tenant are not confirmed. No news coverage or organized opposition was found.

The site sits among existing warehouses along John Galt Way. The lot next door, at 1100 John Galt Way, already has a warehouse.

What it could mean nearby

Where it stands

The township planning board has handled site plan applications for this lot, with a preliminary amendment listed in 2024 and a final site plan in 2025. The outcomes were not confirmed. After final site plan approval, the usual next steps are construction permits and state and county sign-offs, then building.

Want to weigh in? The Florence Township Planning Board hears site plan applications at public meetings, and residents can comment there. Agendas are posted on the township website.

Who's behind it

Whitesell Construction · A construction and development company named in the township planning board records as the applicant for this lot.

Around the web

Planning terms explained
Site plan
A detailed layout showing a building, parking, driveways, drainage and landscaping, which the township reviews before construction.
Preliminary major site plan
The first stage of approval for a large project, which sets its main design and conditions.
Final site plan
The last board approval, confirming that the project meets the conditions set at the preliminary stage.
Phase 2
The second stage of a project built in more than one part.

Researched by AI from public sources on Nov 2, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $94.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →