Burlington County · Bordentown Township · #20240265
Business building, Block 126, Lot 7.06
Bordentown Township, NJ · 179,800 sq ft non-residential, office
About this project
A new-construction business-use building of about 179,800 sq ft is proposed on Block 126, Lot 7.06 in Bordentown Township, Burlington County.
Official description: Business Uses; reported construction cost $12,220,500
- Plan type
- Building permit (new construction)
- Land use
- Business Uses
- Status
- Permit
Filing history
- 2024-07-08 · #20240265 · Building permit (new construction) · 179,800 sq ft
The full picture AI research · Nov 1, 2026
County records list a new business-use building of about 179,800 square feet on Block 126, Lot 7.06 in Bordentown Township. The county labels it "office," but a trade-press report points to a warehouse.
An August 2024 report describes a speculative warehouse of exactly this size, called Bordentown Crossroads, near the Bordentown Bypass. "Speculative" means it is built without a tenant signed up. The report says the developers are Hillwood and WDG Logistics Partners. It lists a 36-foot ceiling height, 30 loading dock doors, and parking for 94 cars and 30 trailers. The sources found do not give the block and lot, so the link to this parcel is likely but unconfirmed.
The report expected construction to start in late summer 2024 and finish in spring 2025. No opposition, hearing details or tenant were found. What is on the site now is not stated.
What it could mean nearby
- A building with 30 dock doors and trailer parking suggests regular truck traffic near the Bordentown Bypass and the Turnpike's Exit 7.
- The report gives no job counts, and none can be estimated until a tenant is known.
- No residential units are involved, so school impact is unlikely to be direct.
Where it stands
The county filing is dated July 2024. A trade report said construction would begin that summer, which suggests local approvals were done or close. No approval documents were found, so the current status is unconfirmed. Next steps are normally construction permits, then inspections and a certificate of occupancy.
- Apr 2025 Completion was projected for spring 2025, per the trade report.
- Aug 2024 Trade press reported the developers' plan to build the 179,800 sq ft speculative project, with construction starting that summer.
- Jul 8, 2024 Latest county planning filing for Block 126, Lot 7.06.
Want to weigh in? The Bordentown Township Planning Board normally hears site plans for projects like this, and its public meetings are where residents can comment. No pending hearing was found.
Who's behind it
Hillwood and WDG Logistics Partners · The trade report describes a partnership between Hillwood, a Texas-based developer, and WDG Logistics Partners, an Atlanta-based firm. The sources do not say what else they build.
Around the web
- Hillwood, WDG Logistics to Build 179,800 SF Spec Industrial Project in Bordentown, New JerseyREBusiness Online · Aug 12, 2024Reports a same-size speculative warehouse in Bordentown with its features and a planned 2024 construction start.
Planning terms explained
- Speculative ("spec") building
- A building constructed before any tenant has signed a lease.
- Site plan
- A detailed layout of a project's building, parking, drainage and driveways that the township reviews.
- Block and lot
- The tax-map numbers that identify a specific parcel of land.
- Certificate of occupancy
- The final township approval that allows a finished building to be used.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $53.9M
- ~599 roofing squares (assumes 3 stories)
- ~449 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →