Bergen County · Rochelle Park Township · #20240033
Block 8, Lot 1.01 storage building
Rochelle Park Township, NJ · 103,600 sq ft non-residential, warehouse & storage
About this project
A new moderate-hazard storage building of about 103,600 sq ft is planned on Block 8, Lot 1.01 in Rochelle Park Township, with a reported construction cost of $6.3 million.
Official description: Storage building, moderate hazard; reported construction cost $6,300,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Certificate
Filing history
- 2024-02-16 · #20240033 · Building permit (new construction) · 103,600 sq ft
- 2024-02-16 · #240033 · Building permit (new construction) · 103,600 sq ft
The full picture AI research · Nov 1, 2026
County records show a plan for a new storage building of about 103,600 square feet on Block 8, Lot 1.01 in Rochelle Park Township. It is classed as a moderate-hazard storage building, which usually means it would hold goods that burn at a moderate rate. The reported construction cost is $6.3 million.
The county records do not say what is on the site now, who the developer is, or who would use the building. A web search found no news coverage, township agendas or minutes, or developer page that clearly concern this lot.
The search did turn up a self-storage project on a different Rochelle Park site. That project is already built, and nothing ties it to this lot, so it is not treated as part of this proposal.
What it could mean nearby
- Warehouse and storage buildings can bring truck and delivery traffic. The records give no traffic details for this site.
- The records do not say how many jobs the building would create, or whether it would add homes or affect schools.
Where it stands
The latest county filing is dated 2024-02-16. No local approval status was found online. Projects like this normally need township land-use board review and approval of the site plan, then construction permits, before work starts.
- Feb 2024 Latest county planning filing for the project (filed 2024-02-16)
Want to weigh in? Residents can usually comment at a public hearing of the township's planning board or zoning board, if the project needs one. Hearing dates are posted on the township website.
Planning terms explained
- Block and Lot
- The numbers the township tax map uses to identify a specific parcel of land.
- Site plan approval
- A review by the local land-use board of a project's layout, including parking, access, drainage and landscaping.
- Moderate-hazard storage
- A building-code category for storage of materials that burn at a moderate rate, which sets fire-safety rules for the building.
- Non-residential square footage
- Total building floor area that is not used for housing.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $13.5M
- ~1,036 roofing squares (assumes 1 story)
- ~259 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →