PlannedNearby

Bergen County · Fort Lee Borough · #20250817

514 Main St. storage building

514 Main St., Fort Lee Borough, NJ · 89,359 sq ft non-residential, warehouse & storage

About this project

A new moderate-hazard storage building of about 89,400 square feet at 514 Main St. in Fort Lee Borough, Bergen County, NJ, with a reported construction cost of about $10.1 million.

Official description: Storage building, moderate hazard; reported construction cost $10,115,000

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2025-08-19 · #20250817 · Building permit (new construction) · 89,359 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

County records show a proposal for a new storage building of about 89,400 square feet at 514 Main St. in Fort Lee Borough. It is classed as a moderate-hazard storage building, and the reported construction cost is about $10.1 million.

The records do not say what is on the site now, who would use the building, or whether it would be self-storage or warehouse space. No news coverage, borough agenda or minutes, or developer page could be tied to this address, so nothing is known about opposition or approvals.

The most recent county filing is dated August 19, 2025.

What it could mean nearby

Where it stands

The latest county filing is dated 2025-08-19, and no borough approval or hearing record was found online. Projects like this usually need local land-use approval and building permits before construction can begin.

Want to weigh in? The Fort Lee Borough land-use board, usually the Planning Board or Zoning Board of Adjustment, would normally hear any application, and residents can usually comment at its public meetings. The borough clerk or land-use office can confirm which board and when.

Planning terms explained
Moderate-hazard storage
A building-code category for storing goods that burn at a moderate rate, which sets fire-safety requirements.
Non-residential square footage
Floor area used for business or storage rather than housing.
Site plan approval
A local board's review of a project's layout, parking, drainage and access.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $11.6M