Atlantic County · Egg Harbor Township · #20251175
1821 Mays Landing S.P. Rd
1821 Mays Landing S.P.Rd, Egg Harbor Township, NJ · 14,491 sq ft non-residential, warehouse & storage
About this project
New moderate-hazard storage building of about 14,491 sq ft at 1821 Mays Landing S.P. Rd in Egg Harbor Township.
Official description: Storage building, moderate hazard; reported construction cost $520,000
- Plan type
- Building permit (new construction)
- Land use
- Storage building, moderate hazard
- Status
- Permit
Filing history
- 2025-09-15 · #20251175 · Building permit (new construction) · 14,491 sq ft
The full picture AI research · Nov 1, 2026
A new storage building of about 14,491 square feet is proposed at 1821 Mays Landing S.P. Rd in Egg Harbor Township, Atlantic County. County records classify it as a warehouse and storage use with a moderate fire-hazard rating. That rating is a building-code category for what will be kept inside. It does not describe the neighborhood.
The county's most recent filing is dated September 15, 2025. The records do not say what is on the site now, who will use the building, or what will be stored in it.
No news coverage, township meeting agendas, hearing notices or developer web pages specific to this project were found. This explanation therefore rests on the county records alone.
What it could mean nearby
- Truck and delivery traffic could increase on Mays Landing S.P. Rd (Route 40/50 corridor area). The records do not give trip counts or driveway plans.
- Staffing, hours and number of jobs are not stated in the records.
- The building is small for a warehouse and no homes are proposed, so school or housing effects are unlikely.
Where it stands
The project appears in county planning records, with the latest filing on September 15, 2025. No township approval status was found online. Projects like this usually need local site plan review and construction permits before building starts.
- Sep 15, 2025 Latest filing in the county planning records
Want to weigh in? The Egg Harbor Township planning or zoning board usually decides on local site plan matters, and residents can comment at its public meetings. Agendas are posted on the township website, and this project's hearing date is not known.
Planning terms explained
- Site plan review
- A local board's check of a building's layout, parking, drainage and access before it approves construction.
- Moderate-hazard storage
- A building-code category for storage of materials that burn at a moderate rate, which sets fire-safety requirements.
- Non-residential square footage
- The total floor area of the building that is not used for housing.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $1.9M
- ~144 roofing squares (assumes 1 story)
- ~36 tons of cooling (rule of thumb 400 sq ft/ton)