Atlantic County · Egg Harbor Township · #20260817

Storage building at 6415 Delilah Road

6415 Delilah Road, Egg Harbor Township, NJ · 124,800 sq ft non-residential, warehouse & storage

About this project

A new moderate-hazard storage building of about 124,800 sq ft at 6415 Delilah Road in Egg Harbor Township, with a reported construction cost of $6,213,050.

Official description: Storage building, moderate hazard; reported construction cost $6,213,050

Plan type
Building permit (new construction)
Land use
Storage building, moderate hazard
Status
Permit

Filing history

  • 2026-07-16 · #20260817 · Building permit (new construction) · 124,800 sq ft
  • 2026-06-18 · #20260674 · Building permit (new construction) · 124,800 sq ft
  • 2026-06-18 · #20260675 · Building permit (new construction) · 21,000 sq ft

NJ construction permit data (DCA) →

The full picture AI research · Nov 1, 2026

A new storage building of about 124,800 square feet is proposed at 6415 Delilah Road in Egg Harbor Township. County records list it as a moderate-hazard storage building with a reported construction cost of about $6.2 million.

A sales listing for the same address describes it as a four-story, climate-controlled self-storage project with space for enclosed boat and RV parking. The listing calls the project "entitled", which suggests local approvals may already exist. It also says the site is in an Opportunity Zone, a federal tax-incentive area. It puts the site at the roundabout where Delilah Road, Route 563 and Tilton Road meet.

The listing is marketing material, so its details are unverified. No planning board minutes, news coverage or opposition were found. The current use of the site and the eventual operator are not known from the sources found.

What it could mean nearby

Where it stands

County records show a filing dated 2026-07-16. A sales listing describes the project as entitled, but the approval was not confirmed in township records. Next steps usually include construction permits, then construction, unless the property is sold and the plans change.

Want to weigh in? If any approval is still pending, the Egg Harbor Township Planning Board would decide, and residents can usually speak at its public meetings. No hearing notice was found.

Around the web

Planning terms explained
Entitled
A property that already has the local land-use approvals needed to build the proposed project.
Opportunity Zone
A federally designated area where investors can get tax benefits for investing in development.
Moderate-hazard storage
A building-code category for storage of materials that burn at a moderate rate, which affects fire-safety requirements.
Roundabout
A circular intersection where traffic flows around a central island instead of stopping at signals.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $16.2M