PlannedNearby

Northampton County · Palmer Township · #2026-08-320-unit-apartment-phase-2-on-van-buren

320-unit apartment Phase 2 on Van Buren Road

1492 Van Buren Road, Palmer Township, PA · 320 homes, apartments

About this project

Phase 2 would add seven four-story apartment buildings with 320 units, three 12-car garages, a clubhouse with pool and pickleball court, and two bridges over Schoeneck Creek. The site is currently farmland, and the Phase 1 development is already next to it.

County recommendation: Raises serious concerns

Issues raised: Housing next to Route 33 (noise, diesel fumes), Karst sinkholes; geotechnical report does not match plans, Floodplain mitigation for first floors, Traffic study uses the wrong site location, Protection of creek, wetlands and habitat

Plan type
Land use of regional significance
Land use
apartments

Filing history

  • 2026-08-25 · #2026-08-320-unit-apartment-phase-2-on-van-buren · Land use of regional significance · 320 lots/units

LVPC committee packet (PDF) →

Map pin is approximate.

The full picture AI research · Nov 2, 2026

The developer proposes seven four-story apartment buildings with 320 units on farmland at 1492 Van Buren Road in Palmer Township. The plan also includes three 12-car garages and a clubhouse with a pool and pickleball court. Two bridges would carry roads or drives over Schoeneck Creek. Phase 1 of the development is already next to the site.

A 2025 trade-press report describes a joint venture of two investment firms planning a $110 million project at this address. It lists 320 apartments in seven buildings plus 92 for-sale townhomes, with construction expected to start in early 2026. The sources reviewed do not say whether that project is the same as this Phase 2 filing. No news coverage of opposition or of specific approvals was found.

What it could mean nearby

Where it stands

A county filing was made on 2025-08-25 (as recorded), and no approval decision was found online. Plans like this usually go through township planning commission review, then a vote by the township supervisors, followed by state permits for the creek crossings.

Want to weigh in? The Palmer Township planning commission and board of supervisors usually review such plans at public meetings, and residents can comment there. Agendas are posted on the township website.

Who's behind it

Black Bear Asset Management and Greystone Capital (joint venture) · A trade-press report names these two firms as a joint venture behind a project at this address, but it is not confirmed that the same venture is behind this Phase 2 filing.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing buildings, roads, parking and utilities that the township must approve before construction.
Phase 2
A later stage of a larger project built after the first stage.
Planning commission
An appointed board that reviews development plans and advises the elected supervisors.
Stream crossing permit
State approval needed to build a bridge or similar structure over a creek.

Researched by AI from public sources on Nov 2, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $76.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →