Chester County · West Brandywine Township · #LD-06-25-18565
1800 & 1804 Horseshoe Pike storage facility
West Brandywine Township, PA · 97,400 sq ft non-residential, warehouse & storage · 27.5 acres
About this project
Twelve storage buildings totaling 97,400 sq ft on one 27.5-acre lot in West Brandywine Township, including three climate-controlled indoor facilities. The plan also includes a lot line revision.
Official description: LD = 12 storage buildings on 1 lot totaling 97,400sf, SD = 2 lots into 2 lots (lot line revision). The development will include twelve (12) storage facilities including three (3) climate controlled indoor storage facilities, vehicular circulation, associated grading, utilities, and stormwater management improvements.
- Plan type
- Land development
- Land use
- Unique
- Status
- Reviewed
Filing history
- 2025-06-18 · #LD-06-25-18565 · Land development · 97,400 sq ft
- 2025-06-18 · #SD-06-25-18567 · Subdivision
- 2025-03-25 · #LD-03-25-18463 · Land development · 97,400 sq ft
- 2025-03-25 · #SD-03-25-18462 · Subdivision
The full picture AI research · Nov 1, 2026
The proposal, called Pickering Valley in township records, would put twelve storage buildings on a single 27.5-acre lot at 1800 and 1804 Horseshoe Pike in West Brandywine Township. Together they would total about 97,400 square feet. Three of the buildings would be indoor, climate-controlled storage.
The plan also includes a lot line revision. This adjusts the boundary between the two properties so the storage buildings sit on one lot.
The township's newsletter and a board agenda describe the project. No news coverage, opposition, or named storage operator was found. The records reviewed did not say what is on the site now.
What it could mean nearby
- Storage uses usually bring fewer daily car trips than shops or homes. No traffic study was found, so the effect on Horseshoe Pike (US 322) is unconfirmed.
- No records found mention new homes, school impacts, or large numbers of jobs.
Where it stands
The plan is listed as an active subdivision and land development application on the township's update page. A township agenda says the legal review clock began on 2025-03-13 and was set to run to 2026-04-30. No approval vote was found, so the current status is unconfirmed. Next steps usually include the planning commission's review, a supervisors' vote on final approval, and then building permits.
- Apr 30, 2026 Date the township's review clock was set to expire, per a board agenda
- Jun 18, 2025 Latest county planning filing for the project
- Mar 13, 2025 Township review clock began for the land development application (LD-2025-01)
Want to weigh in? The West Brandywine Township Board of Supervisors makes the decision on land development plans, and residents can comment at its public meetings or in writing to the township; check the township website for agendas.
Around the web
- Land Development UpdatesWest Brandywine TownshipLists Pickering Valley at 1800 and 1804 Horseshoe Pike as an active subdivision and land development item.
- West Brandywine Township Board of Supervisors agendaWest Brandywine TownshipShows the final subdivision and land development application (LD-2025-01) and its review clock from 2025-03-13 to 2026-04-30.
- West Brandywine Township newsletter, Spring-Summer 2026West Brandywine TownshipDescribes the lot line change and twelve storage facilities, three of them climate-controlled.
Planning terms explained
- Land development
- A formal township review of a plan to build or significantly change buildings and site layout on a property.
- Lot line revision
- A change to the boundary between neighboring parcels without creating new building lots.
- Time clock
- The legal deadline by which a township must act on a submitted plan.
- Climate-controlled storage
- Indoor storage units kept at regulated temperature and humidity.
- Final subdivision and land development
- The last plan review stage before a project can get approval to proceed to permits.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $12.7M