About this project

This proposal combines four parcels into a 62.32-acre site for two warehouses totaling about 556,000 square feet, with roughly 1.2 million square feet of impervious surface. The site is currently single-family residential and vacant land. Public water and private sewer would serve it.

County recommendation: Supports, with comments

Issues raised: Conditional use approval needed for Arterial Corridor overlay; no official action until zoning resolved, Parking setback and stall size waivers, Stormwater waivers for basin fencing, berm width, and depth to limiting zone, Risk of long vacancy or conversion to data center or fulfillment use; zoning should address these, Stormwater basin drainage to Morgan Creek floodplain

Applicant
John Edwin, Development Services, LLC
Plan type
Preliminary land development
Land use
warehouse
Zoning
PC Planned Commercial District

Filing history

  • 2025-12-08 · #12882 · Preliminary land development · 556,050 sq ft

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

The developer proposes two warehouses totaling about 556,000 square feet on a 62.32-acre site at the southwest corner of Route 309 (West End Boulevard) and Tollgate Road in Richland Township, near Quakertown. The plan combines four parcels. A township newsletter lists one building of about 400,000 square feet and one of about 156,000 square feet. Roughly 1.2 million square feet would be paved or roofed.

The land now holds single-family homes and vacant land. Earlier coverage described part of it as a former car lot. Public water would serve the site, and sewage would be handled privately.

An earlier 2024 version was a single building of about 649,000 square feet. The township supervisors opposed the developer's request to build it taller than zoning allows, and residents raised concerns about truck traffic and views. The two-building plan appears to be a revision. No tenant has been named.

What it could mean nearby

Where it stands

The project was still listed as under consideration by the township in fall 2025, and the county filing is dated December 2025. No final approval or denial was found. Next steps usually are township planning commission and supervisor review of the land development plan, plus state permits for stormwater and sewage.

Want to weigh in? The Richland Township Board of Supervisors and Planning Commission review land development plans at public meetings held at the township building on California Road, where residents can comment.

Who's behind it

Development Services, LLC · A real estate development company named on the filings; no official website or other projects were found.

Around the web

Planning terms explained
Land development plan
The detailed site plan a township reviews before allowing buildings, parking and utilities to be built.
Variance
Special permission to depart from a zoning rule, such as a maximum building height.
Zoning hearing board
A local panel that decides variance requests at public hearings.
Impervious surface
Paved or roofed ground that does not absorb rainwater, which increases runoff.
Rezoning
A change to the zoning category of land, decided by the elected supervisors.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $72.3M