About this project

Phase 2 of the Melsky Tract would divide 66.41 acres of agricultural land into 35 single-family home lots and 5 open space lots, served by public water and sewer. The county found the proposed density exceeds the zoning maximum for the Conservation Management district.

County recommendation: Raises serious concerns

Issues raised: Density of 0.68 units per acre exceeds 0.33 maximum, Required contiguous open space missing for lots under 3 acres, Park and recreation land dedication must be confirmed, Plan treated as a new application under current ordinances, Sewage planning module may be required

Applicant
Dolington Land, LP
Engineer / designer
S.T.A. Engineering, Inc.
Plan type
Preliminary plan of subdivision and land development
Land use
single-family
Zoning
FCO Federal Cemetery Overlay within CM Conservation Management

Filing history

  • 2026-08-18 · #11165-B · Preliminary plan of subdivision and land development · 35 lots/units

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 2, 2026

Phase 2 of the Melsky Tract would split about 66 acres of farmland on the north side of Stoopville Road, east of Eagle Road, into 35 single-family home lots and 5 open space lots. The homes would connect to public water and sewer.

The county's review found that 35 homes is more than the zoning allows in the Conservation Management district. That district is meant to protect rural land, so it limits how many homes can be built.

The same site has a long history. A 2021 local news post says the township supervisors rejected an earlier 45-home plan by a different builder for about 66 acres off Stoopville Road. The supervisors said the site could not support that many homes and that stormwater would not soak into the ground properly. The post says the site had been in disputes for nearly 15 years. It does not say how that dispute ended, or whether the 2026 plan is connected to it.

What it could mean nearby

Where it stands

The county has reviewed the plan and found the density exceeds the zoning maximum, so it is not yet approved. The township supervisors usually decide next on the subdivision, and the developer may revise the plan or seek zoning relief.

Want to weigh in? The Upper Makefield Township Board of Supervisors would likely decide on the subdivision, and residents can usually comment at its public meetings. Check the township website for agendas.

Who's behind it

Dolington Land, LP · Dolington Land, LP is the applicant on the county filing, with S.T.A. Engineering, Inc. also named. No company website or other projects were found.

Around the web

Planning terms explained
Conservation Management district
A zoning area that limits development so farmland and natural features are protected.
Density
The number of homes allowed on a given amount of land.
Open space lot
A parcel set aside from building, often kept as green space.
Subdivision
Dividing a larger piece of land into separate lots for building or sale.
Stormwater infiltration
Letting rainwater soak into the ground on site instead of running off to neighboring land.

Researched by AI from public sources on Nov 2, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $19.6M