Berks County · Tulpehocken Township · #65-11007b
Dollar General - Womelsdorf
Southeast of the intersection of Four Point Road and Rehrersburg Road (SR 419)., Tulpehocken Township, PA · 9,100 sq ft non-residential, retail & commercial · 2.8 acres
About this project
Construction of a 9,100-square-foot retail store with parking on about 2.8 acres southeast of Four Point Road and Rehrersburg Road (SR 419) in Tulpehocken Township.
Official description: Construct a 9,100 ft2 commercial retail store along with parking and other amenities
- Applicant
- PTV 1310 LLC
- Owner
- Wilhelm Anthony
- Developer
- PTV 1310 LLC
- Engineer / designer
- Larson Design Group
- Plan type
- Final
- Land use
- Commercial
- Water
- OL
- Sewer
- OL
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
A 9,100-square-foot retail store with a parking lot is proposed on about 2.8 acres in Tulpehocken Township, Berks County. The site is southeast of Four Point Road and Rehrersburg Road (SR 419). The project is listed in county records as a Dollar General in the Womelsdorf area.
The records list the landowner or applicant as PTV 1310 LLC. Larson Design Group is also named on the filing. The county summary does not say what is on the site now. Land at this size in the township is often open or farm land, but the records do not confirm that.
No news coverage, township meeting minutes, hearing notices or developer project page specific to this site was found online. Details beyond the county filing, including approvals, opposition and the opening date, are unknown.
What it could mean nearby
- The store would add a new driveway and customer traffic on or near SR 419, a state-numbered road. No traffic study was found.
- A 9,100-square-foot store would add paved parking and a roof, which usually means new stormwater controls. The records do not describe them.
- Retail stores of this size usually bring a small number of jobs. No figure was found for this site.
Where it stands
The latest county filing is dated 2024-08-21, which points to a land development plan under review at the township and county level. No approval or denial was found online. Next steps are usually township planning commission and supervisor review, then state road access and stormwater permits, then construction.
- Aug 21, 2024 Latest filing for the project in county planning records
Want to weigh in? The Tulpehocken Township supervisors and planning commission usually decide on land development plans. Residents can comment at their public meetings, and the township office can confirm dates.
Who's behind it
PTV 1310 LLC · PTV 1310 LLC is the entity named on the filing. Similarly named PTV companies appear on other Dollar General store plans, but no company website was found.
Planning terms explained
- Land development
- A formal plan review for building on a site, covering the building, parking, drainage and access.
- SR 419
- State Route 419, a road maintained by the state, so driveway access usually needs state approval.
- Stormwater management
- Measures such as basins that control rain runoff from roofs and pavement.
- Planning commission
- A local advisory board that reviews development plans and makes recommendations to elected officials.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.0M
- ~91 roofing squares (assumes 1 story)
- ~22 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →