Berks County · Penn Township · #4615-10975a

Poultry barn and farm buildings on Ernst Road

West side of Ernst Road west of the intersection with Plum Road., Penn Township, PA · 48,136 sq ft non-residential, agricultural · 54.1 acres

About this project

A poultry barn, egg room, manure storage structure and implement shed with site work on about 54 acres west of Ernst Road in Penn Township.

Official description: Poultry barn (78x442), egg room (60x60), manure storage (92x55), implement shed (50x100) and site improvements

Developer
Brian Weaver
Engineer / designer
NCS. INC.
Plan type
Preliminary
Land use
Agricultural
Water
OL
Sewer
N/A
Status
Reviewed

Filing history

  • 2026-02-06 · #4615-10975a · Preliminary · 48,136 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

County planning records describe a farm project on about 54 acres on the west side of Ernst Road in Penn Township, Berks County. It would include a poultry barn, an egg room, a structure for storing manure and a shed for farm equipment. Together the buildings total about 48,000 square feet, along with the site work needed to support them (driveways, grading and drainage).

The project is classed as agricultural. The records do not say what is on the land now, but the surrounding area is rural.

A search of public sources found no news coverage, township meeting records, hearing notices or company pages about this project. Nothing was found on opposition, approvals or who will operate the barn. The county filing lists a person and a firm, NCS, Inc., as the parties involved.

What it could mean nearby

Where it stands

The latest county filing is dated 2026-02-06, which suggests the plans are under review. No approval or hearing information was found online. Agricultural projects like this usually need township and county review of the site plan, along with stormwater and manure management approvals, before construction starts.

Want to weigh in? The Penn Township supervisors and planning commission are the likely local reviewers, and comments can usually be made at their public meetings; confirm dates with the township office.

Who's behind it

NCS, Inc.

Planning terms explained
Site work
Preparation of the land, such as grading, driveways and drainage, before or alongside building.
Manure storage structure
A built facility, usually lined and covered or enclosed, that holds animal waste until it can be used as fertilizer.
Implement shed
A building for storing farm machinery and equipment.
Land development plan
A set of plans a township reviews to check that new buildings and site changes meet local rules.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $9.6M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →