PlannedNearby

Berks County · Ontelaunee Township · #45-10783f

McIntosh Farms III

Southeastern extension of Cameo Lane, east of Sunglo Drive, extending to Gernants Church Road., Ontelaunee Township, PA · 96 homes, single-family homes · 56.6 acres

About this project

96 twin homes of about 1,920 sq ft each on roughly 56.6 acres in Ontelaunee Township, with 26.98 acres of open space and five stormwater basins.

Official description: 96 SD- approxinately 1,920 sqft/dwelling unit, Open Space areas A-E 26.98 acres w/ 5 stormwater basins in 4 of the 5 areas

Applicant
Forino Co., L.P.
Developer
Forino Co., L.P.
Engineer / designer
C2C Design Group; Elliot Leomporra
Plan type
Preliminary
Land use
Twins, Open space
Water
P
Sewer
P
Status
Reviewed

Filing history

  • 2025-03-13 · #45-10783f · Preliminary · 96 lots/units

County plan review office →

The full picture AI research · Nov 1, 2026

McIntosh Farms III is a proposed extension of the existing McIntosh Farms neighborhood in Ontelaunee Township, Berks County. County records describe 96 twin homes (two homes sharing a wall) of about 1,920 square feet each. They would sit on roughly 56.6 acres. The new street would continue Cameo Lane to the southeast, starting east of Sunglo Drive and running to Gernants Church Road.

The plan sets aside about 27 acres as open space. It also includes five stormwater basins, which are low areas that hold and slowly release rain runoff. The most recent county filing is dated March 13, 2025.

No news coverage, township meeting records, or developer project page specific to this phase was found. Home listings show the developer has already built semi-detached and other homes in earlier McIntosh Farms phases nearby.

What it could mean nearby

Where it stands

The project has a county planning filing dated March 2025. No approval decisions were found online. Plans like this usually go through township planning commission and supervisor review, plus stormwater and sewer permits, before construction.

Want to weigh in? The Ontelaunee Township planning commission and board of supervisors normally review subdivision plans at public meetings. Residents can usually comment there, and the township office can confirm meeting dates.

Who's behind it

Forino Co., L.P. · Forino Co., L.P. is named on the filing, and listings show the Forino name on homes built in earlier McIntosh Farms phases in Ontelaunee Township.

Around the web

Planning terms explained
Twin home
Two separate homes joined by one shared wall, each on its own lot.
Stormwater basin
A shallow, engineered basin that collects rain runoff and releases it slowly to prevent flooding.
Open space
Land in a development kept free of buildings, such as for natural areas, trails or buffers.
Land development plan
The detailed plan a township reviews for streets, lots, utilities and drainage before it allows construction.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $53.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →