Berks County · Exeter Township · #21-13842

Solid Waste Services garage and office

East side of Red Lane approximately 300-feet south of the intersection with Perkiomen Avenue (US 422 East)., Exeter Township, PA · 30,000 sq ft non-residential, industrial · 12.9 acres

About this project

A preliminary plan in Exeter Township proposes a 14-bay, 100-by-173-foot garage connected to a 100-by-127-foot office building on 12.88 acres on Red Lane, replacing three existing structures.

Official description: New 14 bay garage (100'x173') connected w/ 100'x127' office building as associated improvements; removing 3 Ex structures

Applicant
F R & S Inc.
Developer
F R & S Inc.
Engineer / designer
Boyer Engineering LLC; Brian Boyer, PE
Plan type
Preliminary
Land use
Commercial
Water
P
Sewer
P
Status
Reviewed

Filing history

  • 2024-05-28 · #21-13842 · Preliminary · 30,000 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

The proposal is a new base for a solid waste hauling operation on Red Lane in Exeter Township. It would have a 14-bay vehicle garage of about 100 by 173 feet. That garage would connect to a 100-by-127-foot office building. Together they total roughly 30,000 square feet on 12.88 acres.

Three existing structures on the site would be replaced. County records list F R & S Inc. as the applicant and Boyer Engineering as the engineer.

A local news report from December 2024 describes a Solid Waste Services plan along Route 422 that appears to be this project. The township planning commission gave conditional preliminary approval. The report calls the project part of a larger regional waste company. The approval depended on landscape screening paperwork and a traffic study that was still underway. The commission also waived an environmental assessment requirement. The report does not give the site size or describe the buildings, so the match rests on the shared name, engineer and township.

What it could mean nearby

Where it stands

The township planning commission gave conditional preliminary approval in late 2024, and the county filing is dated May 2024. No later approval was found. Next usually come the township supervisors' decision, then a final plan once the conditions are met.

Want to weigh in? The Exeter Township Board of Supervisors makes the next decision, and residents can comment at its public meetings or by contacting the township office.

Who's behind it

F R & S Inc. · F R & S Inc. is the company on the filing. State environmental records show it operating a landfill on Red Lane in Exeter Township, and the news report ties the Solid Waste Services plan to a larger regional waste company.

Around the web

Planning terms explained
Preliminary plan
An early-stage site design the township reviews before a final, detailed plan is approved.
Land development
A township review of building, parking, drainage and access on a site.
Conditional approval
Approval that stands only if the applicant meets listed requirements.
Traffic impact study
An analysis of how much added traffic a project would create and whether road changes are needed.
Waiver
Permission to skip a particular township requirement.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.9M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →