About this project

Gravel Pike Holdings is expanding its light manufacturing facility by adding a two-story, 17,000-square-foot west-side addition with truck loading bays and 10 new parking spaces. The expanded facility will serve 37 total parking spaces with 34 additional spaces held in reserve. Public water and sewer provide utilities.

County planning commission: Supports, with comments

Issues raised: parking and reserve parking encroach on wooded area, sidewalk waiver conflicts with county growth-area walkability goals, tree and woodland preservation concerns

Applicant
Gravel Pike Holdings, LLC
Engineer / rep.
Horizon Engineering Associates, LLC
Zoning
LIC-1
Cross street
Geryville Pike
Approvals needed
waiver for sidewalks and curbs along Quakertown Road, waiver for parking lot landscaping, waiver for parking stall dimensions, waiver for entrance driveway width, waiver for tree inventory, waiver for tree disturbance calculation
Utilities
public water, public sewer

Filing history

  • 2026-05-01 · MCPC #26-0119-001 · Land Dev Plan, Prelim Plan · 17,000 sq ft

County review letters
2026-05-01 · UHANO 26-0119-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Gravel Pike Holdings, LLC plans to expand its light manufacturing building at 2528 Quakertown Road in Upper Hanover Township. The plan adds a two-story addition of about 17,000 square feet on the west side of the existing building. The addition would have truck loading bays.

The site covers about 3.9 acres and already has a working manufacturing facility. The project would add 10 parking spaces, bringing the total to 37. Space for 34 more spaces would be set aside and not built unless needed later. The building would connect to public water and public sewer.

No news coverage, developer project page, or township meeting record could be confirmed for this project. The expansion is described only in the county planning record, filed May 1, 2026.

What it could mean nearby

Where it stands

The county filed the project on 2026-05-01, which means it is in local review. Typically the township planning commission and supervisors review the land development plan next. They can approve it with conditions, and building permits follow.

Want to weigh in? Upper Hanover Township's planning commission and board of supervisors usually review land development plans at public meetings, and residents can comment there.

Who's behind it

Gravel Pike Holdings, LLC · The county record lists it as the owner expanding a light manufacturing facility. Engineering work is by Horizon Engineering Associates, LLC.

Planning terms explained
Land development
A formal township review of plans to build or expand a building, including its parking, drainage and utilities.
Light manufacturing
Making products indoors in a way that causes less noise, smoke and traffic than heavy industry.
Reserve parking
Spaces shown on the plan but left unbuilt until the township or owner decides they are needed.
Public water and sewer
Service from a community utility system rather than a private well or septic tank.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.2M