PlannedNearby

Montgomery County · Towamencin · MCPC #25-0199-001

Dock Woods Hybrid Apartments

304 Dock Drive, Towamencin, PA · 17 homes, senior living · 21.54 acres

About this project

Living Branches plans to tear down two existing multiplexes in the Dock Acres section of the Dock Ridge Senior Residences campus at 304 Dock Drive and replace them with one building of 17 apartments, with a parking garage. The building would be up to 52 feet tall, above the 35-foot limit, so it needs conditional use approval. The work would affect about 1.91 acres of the 21.54-acre site.

County planning commission: Supports, with comments

Issues raised: Existing Dock Drive sidewalk to be removed; county wants it kept or replaced, plus a crosswalk at the entry, No renderings or elevations submitted for the 52-ft building, Lawn and front/rear areas have little planting; county suggests rain gardens and street trees, Central greenspace opportunity in the parking island across from the garage entry, Shrub plant groupings should be changed to groups of 3, 5, or 7

Applicant
Living Branches
Engineer / rep.
Bohler Engineering PA, LLC
Zoning
IN
Tax parcel
53-00-08506-00-9
Cross street
Community Drive
Approvals needed
conditional use (building height 52 ft vs. 35 ft maximum, Sec. 153-415.E), land development approval (preliminary/final), waivers
Utilities
public water, public sewer
Demolition
Two existing multiplexes in the Dock Acres section along Dock Drive

Filing history

  • 2025-09-23 · MCPC #25-0199-001 · Land Dev Plan, Prelim Plan, Conditional Use · 17 homes

County review letters
2025-09-23 · TOWAM 25-0199-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Living Branches, a senior-living nonprofit, wants to tear down two existing multiplexes in the Dock Acres part of its Dock Ridge Senior Residences campus at 304 Dock Drive in Towamencin Township. They would be replaced with one apartment building holding 17 homes, plus a parking garage.

The building would be up to 52 feet tall. The township's usual limit is 35 feet, so the developer needs a special approval called conditional use. The work would touch about 1.91 acres of the 21.54-acre campus.

Township agendas show the project moved through that process. In October 2025 the township considered advertising a hearing. A conditional use hearing was on a spring 2026 agenda, and a later agenda listed a written decision and order. The agenda listings seen did not state the outcome.

What it could mean nearby

Where it stands

Township agendas indicate the conditional use hearing has taken place and a written decision and order was scheduled for approval, but the outcome was not confirmed from the sources found. Next would typically be land development review, or a waiver of it, and then permits.

Want to weigh in? The Towamencin Township Board of Supervisors handles conditional use and meets publicly, and residents can comment during its meetings or contact the township office.

Who's behind it

Living Branches · Living Branches is a senior-living provider that operates the Dock Ridge Senior Residences campus; its engineering firm on the filing is Bohler Engineering.

Around the web

Planning terms explained
Conditional use
A use or feature the zoning code allows only after the township governing body holds a public hearing and approves it.
Height limit
The zoning cap on how tall a building may be, here 35 feet.
Land development
The township's formal review of site plans for new buildings, parking and utilities.
Decision and order
The written ruling that records a board's decision and any conditions after a hearing.
Waiver
Permission to skip or modify a specific township requirement.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →