PlannedNearby

Montgomery County · Lower Salford · MCPC #25-0088-002

Clemens Mill

531, 537, 545 Main Street, Lower Salford, PA · 12 homes, townhomes · 2.14 acres

About this project

The Clemens Mill project proposes 14 residential dwelling units on 2.14 acres at 531 Main Street in Lower Salford Township's Village Commercial district. Development includes 12 new two-family (twin) dwellings plus retention of 2 existing dwellings, with 6 units fronting Main Street and 8 units fronting a new street called Chelsea Lane. The site will be served by public water and sewer, with new sidewalks, a public pedestrian path, and stormwater management facilities.

County planning commission: Supports, with comments

Issues raised: Shrub species diversity at detention basin, Difficulty maintaining slopes below retaining wall, Street tree placement and maintenance near guide rail, Consider future pedestrian bridge over tributary for trail connectivity

Engineer / rep.
Richard C. Mast Associates, P.C.
Zoning
VC
Tax parcel
50-00-01879-00-6, 50-00-01876-00-9
Cross street
Maple Avenue
Utilities
public water, public sewer
Demolition
existing retaining wall

Filing history

  • 2026-02-19 · MCPC #25-0088-002 · Land Dev Plan, Prelim Plan, Resubmission · 12 homes
  • 2025-04-25 · MCPC #25-0088-001 · Land Dev Plan, Prelim Plan · 12 homes

County review letters
2025-04-25 · LSALF 25-0088-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

Clemens Mill is a proposed small neighborhood on about 2.14 acres along Main Street in Lower Salford Township. County records describe 12 new twin homes, which are two attached homes on one building. Two existing homes would stay, so the site would have 14 homes in total. Six homes would face Main Street. Eight would face a new street called Chelsea Lane.

The site is in the township's Village Commercial zoning district. It would connect to public water and sewer. Plans also include new sidewalks, a public walking path and stormwater facilities to manage runoff.

The township's "Eye on Development" page lists the project as 12 twin homes. It appears both as approved at the preliminary plan stage and as a final plan under review by the supervisors. Township planning commission agendas from 2023 and 2025 show the plans have been reviewed over several years. No news coverage, opposition or named occupants were found.

What it could mean nearby

Where it stands

The township lists the preliminary plan as approved, and a final plan is under review by the Board of Supervisors as of the township's latest update. Final plan approval usually comes next, followed by permits and construction.

Want to weigh in? The Lower Salford Township Board of Supervisors decides on the final plan, and residents can comment at its public meetings or by contacting the township.

Who's behind it

Richard C. Mast Associates, P.C. · This firm is named on the county filing. It is likely the site's design or engineering firm rather than the developer, and the developer was not identified in public sources.

Around the web

Planning terms explained
Twin dwelling
Two homes that share one wall, each on its own lot.
Preliminary plan
An early formal plan reviewed by the township before final engineering and approval.
Final plan
The detailed plan the supervisors must approve before building permits are issued.
Village Commercial district
A zoning area that allows a mix of homes and small businesses in a village setting.
Stormwater management
Systems like basins that control rainwater runoff from the site.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.4M