PlannedNearby

Montgomery County · Ambler · MCPC #25-0054-001

220 S CHESTNUT STREET

220 S CHESTNUT STREET, AMBLER, PA 19002, Ambler, PA · 16 homes, townhomes · 0.9 acres

About this project

The owner plans to tear down the roughly 10,000 square foot warehouse-style building at 220 S. Chestnut Street in Ambler and build 16 stacked townhomes on the 0.9-acre lot. Eight units would sit side by side along S. Chestnut Street with eight more stacked above them, and parking would be at the rear. The county's preliminary review says the proposed apartment-style use is not permitted under the current office zoning, so a zoning change would be needed.

County planning commission: Raises serious concerns

Issues raised: Multifamily use not permitted in OC Office Campus District, Lot area of 0.9 acres below one-acre OC minimum, Stacked townhomes do not fit R-3 single-family attached definition, Building height may exceed R-3 40-foot limit, Contiguous unit limit of six under R-3 rules, Front facade, sidewalk connections and frontage vegetation/fencing on S. Chestnut Street

Applicant
Lot Two Real Estate LLC
Engineer / rep.
ProTract Engineering
Zoning
OC
Approvals needed
rezoning to R-3 (under consideration), subdivision plan review, traffic impact analysis
Demolition
Existing 10,000 sq ft warehouse-style building

Filing history

  • 2025-03-04 · MCPC #25-0054-001 · Land Dev Plan, Sketch Plan · 16 homes

County review letters
2025-03-04 · AMBLE 25-0054-001r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The owner proposes to tear down an old warehouse-style building of about 10,000 square feet at 220 S. Chestnut Street in Ambler. In its place, the owner would build 16 stacked townhomes on a 0.9-acre lot. Eight units would sit side by side facing Chestnut Street, with eight more stacked above them. Garages and parking would be at the rear.

The borough planning commission looked at an early sketch plan in March 2025. That plan showed the rear driveway reached from Maple Avenue. The item was carried forward at the April 2025 meeting. County review says this apartment-style use is not allowed under the current office zoning, so a zoning change would be needed. No news coverage, opposition, approval or named future occupants were found for this exact site.

What it could mean nearby

Where it stands

As of the records found, the project was at the early sketch-plan stage with the borough planning commission, and it would need a zoning change before formal plans could be approved. A formal land development application, planning commission and council review, and a public hearing on any rezoning usually come next.

Want to weigh in? Ambler Borough Council decides on any zoning change and formal plans, and residents can comment at its public meetings and hearings, as well as at planning commission meetings.

Who's behind it

Lot Two Real Estate LLC

Around the web

Planning terms explained
Sketch plan
An informal early drawing shown to the borough for feedback before a formal application is filed.
Rezoning
A change to the zoning rules for a property so that a use not currently allowed could be permitted.
Planning commission
A volunteer board that reviews development proposals and advises the borough council.
Stacked townhomes
Townhome-style units arranged with some homes placed above others.
Land development
The formal approval process for building on a site, covering layout, parking, stormwater and similar details.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $5.9M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →