PlannedNearby

Montgomery County · Upper Gwynedd · MCPC #24-0233-001

1500 Pennbrook Parkway

1500 Pennbrook Parkway, Upper Gwynedd, PA · 60 homes, apartments · 5.65 acres

About this project

The Walters Group plans to combine two existing lots at 1500 Pennbrook Parkway in Upper Gwynedd Township and build six residential buildings with 60 apartments, 118 parking spaces, a basketball court and three stormwater facilities. A large part of the site is currently wooded. The project would also remove parking on a neighboring property that encroaches on the site.

County planning commission: Supports, with comments

Issues raised: Landscaping does not appear to meet new township standards, Tree preservation and replacement information is missing, Stormwater basin plantings do not meet the tree and shrub requirement, Proposed Ernst seed mix in stormwater basins

Applicant
The Walters Group
Engineer / rep.
Howell Engineering
Zoning
Office Light Industrial (TOD-2 overlay)
Approvals needed
conditional use, preliminary land development plan approval, waivers
Utilities
proposed sanitary sewer lines, proposed water lines
Demolition
Removal of parking on an adjacent property that encroaches onto the site

Filing history

  • 2024-10-25 · MCPC #24-0233-001 · Land Dev Plan, Prelim Plan, Conditional Use · 60 homes

County review letters
2024-10-25 · UGWYN 24-0233-001ra.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The Walters Group wants to join two lots at 1500 Pennbrook Parkway in Upper Gwynedd Township. It would build six residential buildings holding 60 apartments on about 5.65 acres. The plan also includes 118 parking spaces, a basketball court and three stormwater basins, which are areas that hold and slowly release rainwater. Much of the site is wooded now. The plan would also remove parking on a neighboring property that spills onto this site.

The township has already changed its zoning to allow about 60 apartments in this industrial-zoned area. The supervising board approved that change in August 2023. The change drew opposition from some residents, who raised concerns about crime, crowding and schools. A 2023 news report also said critics had filed a legal notice challenging the vote. The developer filed its detailed site applications in October 2024, and they were still under review in the township's latest update. Who would live in the apartments was not found in the sources.

What it could mean nearby

Where it stands

The zoning change was approved in 2023. The land development and conditional use applications, filed in October 2024, were under review, and the township page showed no final decision. Next come further Planning Commission and Board of Commissioners meetings, with a conditional use hearing and a vote on the plans.

Want to weigh in? The Upper Gwynedd Township Planning Commission and Board of Commissioners review the plans at public meetings, where residents can comment. Meeting dates are listed on the township website.

Who's behind it

The Walters Group · A Delaware Valley developer that builds multi-family apartment communities and also senior housing and beach houses.

Around the web

Planning terms explained
Conditional use
A use the zoning code allows only if the governing board holds a hearing and finds the project meets set conditions.
Land development
The township's formal review of a site plan covering buildings, parking, roads and stormwater.
Zoning text amendment
A change to the written zoning rules that alters what can be built in a district.
Stormwater facility
A basin or similar feature that collects rain runoff from roofs and pavement and releases it slowly.
Board of Commissioners
The elected township body that makes final decisions on zoning changes and development plans.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $14.4M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →