Montgomery County · Upper Providence · MCPC #24-0216-003
HREG - Collegeville Multifamily
1731 - 1765 S. Collegeville Road, Upper Providence, PA · 472 homes, apartments · 30.0 acres
About this project
A development company plans to build 472 apartments on a 30-acre site in Upper Providence. The existing 6 residential buildings on the property will be demolished to make room for the new multifamily housing. About half the site is in a floodplain that will be preserved, and the development will connect to public water and sewer.
County planning commission: Supports, with comments
Issues raised: recreation area spacing not specified, bicycle infrastructure on Route 29, floodplain preservation and management, stormwater detention design complexity, open space composition exceeds standard requirement
- Applicant
- Acquisition Corp Holding Group LLC
- Engineer / rep.
- Nave Newell Inc
- Zoning
- YMU
- Approvals needed
- land development plan approval, subdivision plan approval
- Utilities
- public water, public sewer
- Demolition
- 6 residential buildings and associated outbuildings
Filing history
- 2026-04-01 · MCPC #24-0216-003 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 472 homes
- 2025-05-14 · MCPC #24-0216-002 · Land Dev Plan, Prelim Plan · 472 homes
- 2024-10-04 · MCPC #24-0216-001 · Land Dev Plan, Sketch Plan · 472 homes
County review letters
2024-10-04 · UPROV 24-0216-001r.pdf
2025-05-14 · UPROV 24-0216-002r.pdf
The full picture AI research · Nov 1, 2026
A developer proposes 472 apartments in four buildings on about 30 acres along South Collegeville Road (Route 29) near Perkiomen Boulevard. The site is next to the Collegeville Borough line. It is in the township's Yerkes Mixed-Use District.
The six existing homes on the six parcels would be demolished. About half the site lies in a floodplain, and that part would stay undeveloped. The apartments would connect to public water and sewer.
Township coverage describes the developer as a joint venture. Township records list the applicants as Acquisition Corp. Holding Group and Audubon Land Development. Local news reported that the planning commission held off recommending the plan while technical review comments were still open. It also reported that the developer moved the active recreation areas to the south side of the site after neighbors raised concerns. A citizen-portal summary reports a split 3–2 supervisor vote for tentative approval, with residents concerned about traffic, building height and flooding.
What it could mean nearby
- Traffic: residents have raised concerns about added traffic on Route 29, and the township has not published the traffic details in the sources found.
- Open space: the floodplain half of the site, about 15 acres, would stay undeveloped.
- Neighbors: recreation areas were moved to the south side of the site in response to concerns from Collegeville Borough residents.
- Utilities: the project would connect to public water and sewer, and stormwater basins are part of the plan.
Where it stands
The project appears to be in final land development review. The developer filed its final plan on 2026-04-01, and the township page still lists it under plans under review, with review documents dated through July 2026. Next steps usually include resolving the engineering comments, any waiver decisions, and a final vote by the supervisors.
- Jul 2026 Township stormwater review and a waiver request were added to the township file.
- May 2026 County planning and township engineer reviews of the final plan.
- Apr 1, 2026 Final land development plan and application filed.
- Dec 1, 2025 Township page lists this as the approval date for the earlier plan stage.
- May 14, 2025 Land development application date listed by the township.
Want to weigh in? The Upper Providence Township Board of Supervisors decides on land development plans, and residents can comment at its public meetings or through the township office.
Who's behind it
Acquisition Corp. Holding Group, with Audubon Land Development (county filing also lists Nave Newell Inc) · Local news describes the project as a joint venture of a developer called High Companies and Audubon Land Development; no official project page was found.
Around the web
- HREG - Collegeville Multifamily FLDUpper Providence TownshipLists the applicants, 472 apartments in four buildings, and review documents from April to July 2026.
- Planning Commission Tables Vote on 472-Unit Collegeville Road Apartment ComplexPhoenixville PressThe planning commission held off a recommendation while review comments were open, and the developer moved recreation areas after neighbors raised concerns.
- Upper Providence supervisors grant tentative approval to 472-unit South Collegeville Road development in 3–2 voteCitizen PortalThe headline reports a 3–2 supervisor vote for tentative approval, though the page could not be opened to confirm details.
Planning terms explained
- Land development plan
- The detailed site plan showing buildings, roads, utilities and stormwater that a township must approve before building.
- Floodplain
- Low land next to a stream that floods in heavy rain, where building is restricted.
- Waiver
- A request to be excused from a specific township rule, such as a pipe size.
- Mixed-use district
- A zoning area that allows homes, shops and offices together.
- Stormwater basin
- A planned pond or depression that holds and slowly releases rain runoff.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $113.3M
- ~2,832 roofing squares
- ~472 HVAC systems
- ~472 kitchens / 944+ bathrooms
- ~472,000 sq ft of finished living space
- ~30.0 acres of site work (grading, stormwater, landscaping)
- Stormwater detention basins
- Floodplain preservation
- Public water and sewer infrastructure
- Drainage easement installation
- Site demolition and clearing